Soaring as a Global Plant Engineering Company
-
202012 Received an order for detail design of MACST11 Awarded as an Outstanding Family-Friendly Company11 Selected as a CSR in the Community in 202008 Kicked Off CMA Phase 2 of the ITER04 Signed a contract for consulting service for Tanjung Jati Power Plant in Indonesia
-
201912 Received a government award for proliferating a culture of win-win growth08 APR1400 acquired the design certification from the US Nuclear Regulatory Commission08 Opened KEPCO E&C PR exhibition hall and history hall07 Signed an agreement to dispatch technical personnel with Sargent & Lundy in the US02 Awarded the contract to set up a design configuration management system at Shin Kori 5 and 6
-
201812 Signed the CESS-Work Plan 4 Agreement with the International Organization for ITER10 APR1400 design certification application accepted by US NRC07 Acquired ISO integrated quality, environment, and safety & health management system transfer certifications02 Lee Bae-Soo appointed as the 20th CEO of KEPCO E&C.02 Awarded the contract for Kori 1 decommissioning engineering Project
-
201711 Acquisition of EUR Certificate for EU-APR Standard Design11 Signed MOU with PLNE in Indonesia11 Awarded for the Outstanding Company in the Shared Growth Category in 201708 Establishment of Organization for Nuclear Decommissioning and New Energy Business02 Opended the Branch in Indonesia
-
201611 Won the Grand Prize in the 42nd National Quality Management Contest11 Won the Grand Prize in the 2016 Korea Green Construction Competition06 Awarded Contract for the ITER Construction Management as Agent Services06 Awarded A/E Contract for Pre-Project Engineering of SMART Nuclear Power Plant03 Awarded A/E Contract for Shin-Hanul Nuclear Power Plant Units 3&402 Completed CIPREL IV Volet B EPC Project at Cote d’Ivoire
-
201509 Made Successful Transition from ISO27001:2005 to ISO27001:201308 Moved the Office to Gyeongbuk Dream Valley, Gimcheon07 Signed Decommissioning Technology Transfer Contract with Preussen Elektra of Germany.05 Completed the New Office Building at Gyeongbuk Dream Valley, Gimcheon
-
201412 Achieved 1 Million M/H of Zero Disaster of CIPREL IV Volet B EPC Project04 Awarded A/E Contract for the 2nd Stage of the Facilities for the Disposal of Low and Intermediate Level Radioactive Waste04 Signed A/E & NSSS Contract for Shin-Kori Units 5&602 Obtained ISO 27001 Certification
-
201310 Appointed Koo-Woun Park as the 19th President&CEO07 Signed Contract for EPC Project to Extend CIPREL Power Plant in Cote d’Ivoire05 Conducted Engineering Traning to the ENEC Employees Regarding BNPP Project04 Signed EPC Contract for Osan Combined Heat & Power Plant
-
201212 Ranked No. 1 in Sales of Global Nuclear Power Plant Design by ENR of the USA10 Held Groundbreaking Ceremony for the New Office Building at Gyeongbuk Dream Valley, Gimcheon07 Obtained Construction Permit for BNPP Units 1 & 2 in UAE and First Placing of Concrete
-
201109 Signed Contract to Supply Equipments to Tufanbeyli Thermal Power Plant, Turkey04 Awarded A/E Contract for Taean Thermal Power Plant Units 9&1004 Awarded Contract for Taean IGCC Pilot Plant01 Awarded A/E Contract for Shin-Boryeong Units 1&2