Transmission and substation
Transmission projects
At KEPCO E&C, we have extensive experience and advanced technology ranging from 154kV, 345kV, 765kV UHV to 500kV HADC (high-voltage DC transmission). In addition, we are providing the optimal technical services required for transmission line design based on our various track records and technologies such as transmitting high-voltage direct current through submarine cables between Jeju Island and the mainland. In particular, we successfully carried out the design for the world's first ultra-large offshore 345kV transmission tower foundation and Korea's first 765kV UHV transmission tower foundation. We are also following through with the design for 500kV HVDC transmission tower foundation.
Main scope of work

Transmission line survey

Basic and detailed design of transmission lines

Quality inspection of transmission tower

Licensing and land acquisition for transmission lines

Construction and supervision of transmission lines

Comprehensive performance assessment of aging transmission facilities
Track records
- 1 154kV transmission line
- Turnkey construction project for the 154 kV landfill transmission line in the Seoul metropolitan area
- Design services for the 154kV Shingoseong-Geoje transmission line (Haewol section)
- Vendor design verification for a 154kV transmission tower
- Special foundation design of the 154kV transmission tower and tower relocation design services
- Comprehensive performance assessment for the 154 kV Palbong T/L
- Comprehensive performance assessment for the 154 kV Hagae T/L
- Comprehensive performance assessment for the 154 kV Hocheon and another T/L
- Special foundation design for the 154 kV Woonnam-Anjwa Switching Station T/L construction project
- 2 345kV transmission line
- Basic and detailed design services for the 345kV Yeongheung transmission line
- Design and supervision services for the 345kV Yulguman crossing transmission line
- Basic and detailed design services for the 345kV Gwangyang transmission line
- Design program development for the 345kV angle steel transmission tower foundation
- Design and reinforcement work services for a 345kV transmission tower foundation
- Wire and overhead ground wire selection services for the Boryeong-Cheongyang transmission line
- Design services for the 345kV underground transmission line
- Design services for the 345kV Shinboryeong transmission line
- 3 765kV transmission line
- Feasibility assessment and review services for 765kV basic design
- Quality inspection services for a 765kV steel tube transmission tower
- Detailed design services for the 765kV Phase 1 (Dangjin, Shinseosan, and Shintaebaek sections)
- Design for the 765kV Phase 2 (Kori-Bukgyeongnam section) transmission tower foundation
- Technical review and basic design services for the 765kV single circuit (Shinanseong-Shingapyeong section)
- 4 500kV high-voltage DC transmission line
- Basic design for the 500kV high-voltage DC overhead transmission line
- Detailed design for the transmission tower foundation in the eastern section of the 500kV high-voltage DC East Coast-Shingapyeong transmission line
Substation project
KEPCO E&C has engaged in transmission and substation construction projects to ensure stable supply of electricity generated from power plants to end users such as industries and households. We have played a leading role in substation design, equipment procurement, construction, and supervision projects for AIS(Air-Insulated Switchgear) and GIS(Gas-Insulated Switchgear) substation, starting with the design of the 345kV Shinjecheon substation in 1979, extending to stepping up the voltage from 154kV to 765kV. Major projects include the design of GIS for outdoor substation facilities, standardization design of indoor substation, preparation of 756kV substation design standards (draft), design services for 765kV Shinanseong and Shinseosan substations, the overseas 230kV switchyard design and equipment supply project, and the 500kV substation turnkey project.
Track records
- 1 Design standardization services for the 154 kV indoor GIS(Gas-Insulated Switchgear) (July - December 1996)
- 2 345 kV Shinjincheon S/S construction (December 2001 - June 2003)
- 3 Design services for the construction of the 765 kV Shinanseong/Sinseosan substation (December 1999 - April 2002)
- 4 Construction of 500kV substation for the Ilihan Combined Cycle Power Plant in the Philippines (February 2000 - September 2001)
- 5 Design and equipment supply for ARAMCO Switchyard in Saudi Arabia (September 2002 - July 2003)