LNG combined cycle power plant
LNG combined cycle power plant
Combined cycle power generation is a method to improve thermal efficiency. In keeping with the cycle of gas turbine or steam turbine, high-temperature gas of more than 600℃ discharged after the operation of the gas turbine passes through a heat recovery steam generator to generate steam. Subsequently, the steam flows into a steam turbine to generate additional electricity.
As a primary contractor, KEPCO E&C has constructed more than 60 cogeneration and combined cycle power plants. In addition, we have performed feasibility studies and design & engineering services for the construction of combined cycle power plants at home and abroad, along with multiple design services for combined cycle power plants overseas, including Benghazi/Misurata in Libya and S2 and S3 in UAE. We also carried out domestic EPC projects for Osan Cogeneration and Hanju Combined Heat & Power Plant, as well as overseas EPC projects for Takoradi T1, T2 in Ghana and CIPREL IV in Côte d'Ivoire.
KEPCO E&C has the know-how in optimal design, process, and project management techniques for cogeneration and combined cycle power plants, as well as the management capability to significantly shorten the construction period.

It can be moved to the left and right.
Combined cycle power plant with a capacity of less than 500MW | Combined cycle power plant with a capacity of 800MW | Combined cycle power plant with a capacity of 1000MW |
---|---|---|
24 units | 3 units | 5 units |
Track records
- 1 Design & engineering services for Shin-Incheon Combined Cycle Power Plant (450 MW × 4)
- 2 Design & engineering services for Ulsan Combined Cycle Power Plant #2 (450 MW × 2)
- 3 A/E services for Bugok Unit 1 (500 MW × 1)
- 4 Design & engineering services for Busan Combined Cycle Power Plant (450 MW × 4)
- 5 A/E services for Bugok Unit 2 (500 MW × 1)
- 6 Design & engineering services for the construction of Incheon Combined Cycle Unit 2 (500 MW × 1)
- 7 A/E services for the construction of POSCO Power's LNG Combined Cycle Power Plant Units 5 and 6 (500 MW × 2)
- 8 Detailed design services for the construction of Bugok Combined Cycle Power Plant Unit 3 (400 MW × 1)
- 9 A/E services for Donducheon Combined Cycle Power Plant Units 1 and 2 (750 MW × 2)
- 10 Design & engineering services for the construction of Ulsan Combined Cycle Power Plant #4 (800 MW × 1)
- 11 Phase 2 A/E services for Pyeongtaek Combined Cycle Power Plant (900 MW × 1)
- 12 Design & engineering services for the construction of Yeongnam LNG Power Plant (400 MW × 1)
- 13 Design & engineering services for the construction of Seoul Combined Cycle Power Plant Units 1 and 2 (400 MW × 2)
- 14 Design & engineering services for Jeju LNG Power Plant (200 MW) (114 MW × 2)
- 15Design & engineering services for the construction of Namjeju Combined Cycle Power Plant (125 MW × 1)
- 16 Design & engineering services for Eumseong Combined Cycle Power Plant (561 MW × 2)
- 17 Design & engineering services for Samcheonpo LNG Power Plant (1,200 MW × 1)
- 18 Design & engineering services for Gumi Combined Cycle Power Plant (500 MW × 1)
- 19 Design & engineering services for Haman LNG Power Plant (500 MW × 1)
- 20 Design & engineering services for Hadong Combined Cycle Power Plant Unit 1(1,000 MW × 1)
- 21 Design & engineering services for the construction of Goseong Combined Cycle Power Plant (1,100 MW x 1)
- 22 Takoradi T1, T2 Project in Ghana(Expansion Project of the Takoradi T2 Electric Generating Facility)
- Capacity: 342MW(110ME Add-on) - 23 CIPREL IV Volet B Project in Côte d'Ivoire
- Capacity: 340MW(110ME Add-on) - 24 EPC project for Osan Combined Heat & Power Plant
- Capacity: 436MW - 25 EPC project for Hanju Combined Heat & Power Plant
- Capacity: 144MW