Customer Center

Technology for Earth, Energy for Human

Bid Notice

Bid No, Item for Bid, Notice Date, Deadline for Bid Submission, Content, Attachments가 있는 news detail 테이블입니다.
Bid No 37
Item for Bid Technical consultation for Diversity Design of EU-APR1400 Electrical System
Notice Date 2012-02-21
Deadline for Bid Submission 2012-02-25
Content <div style="MARGIN: 1.2pt -0.15pt 0pt 7.65pt"><span style="FONT-SIZE: 12pt; LETTER-SPACING: 0.1pt"><strong><font face="Times New Roman">(WP) Diversity design in electrical system<br />
</font><br />
</strong><font size="2">The scope of work is to provide KEPCO E&amp;C with engineering support for optimization of the diversity design of EU-APR1400 Electrical System.</font></span></div>
<div style="MARGIN: 1.2pt -0.15pt 0pt 7.65pt"><span style="FONT-SIZE: 12pt; LETTER-SPACING: 0.1pt"><font size="2">KEPCO E&amp;C is responsible for the design of EU-APR1400 which will apply for the Design Certification of EUR. The EU-APR1400 will be an improved design of APR1400 with the necessary changes to enhance safety and to fully comply with European regulatory requirements.<br />
<br />
<font face="Times New Roman">The Contractor performs the following work activities:<br />
<br />
A. Preparation of requirements and operating experiences in European Countries<br />
- Contractor prepares requirements for CCF in the safety-related electrical power system in European countries.<br />
- Contractor prepares the operating experienced diversity design.<br />
<br />
B.&nbsp;Review of the KEPCO&rsquo;s diversity design<br />
- Contractor reviews the KEPCO&rsquo;s diversity design method for the safetyrelated electrical power system.<br />
- Contractor prepares recommendations or comments on the KEPCO&rsquo;s diversity design.<br />
- Preparation of diversity design used in the NPPs in European countries<br />
<br />
The corresponding items that KEPCO wants to acquire information are as follows;<br />
- Medium voltage bus / switchgear between safety trains<br />
- Emergency Diesel Generator (EDG) and Station Black Out (SBO) generator<br />
- Multi-function digital relay (applying 2 out of 3 logic scheme)<br />
- Uninterruptible Power Supply (UPS) system (chargers, batteries, inverters, distribution panels, etc.)<br />
<br />
The Contractor prepares a report containing the outcomes performed in the work<br />
activities in the above.</font><br />
</font></span></div>
Attachments
  • Bid No
    37
    Item for Bid
    Technical consultation for Diversity Design of EU-APR1400 Electrical System
    Notice Date
    2012-02-21
    Deadline for Bid Submission
    2012-02-25
    Content

    <div style="MARGIN: 1.2pt -0.15pt 0pt 7.65pt"><span style="FONT-SIZE: 12pt; LETTER-SPACING: 0.1pt"><strong><font face="Times New Roman">(WP) Diversity design in electrical system<br />
    </font><br />
    </strong><font size="2">The scope of work is to provide KEPCO E&amp;C with engineering support for optimization of the diversity design of EU-APR1400 Electrical System.</font></span></div>
    <div style="MARGIN: 1.2pt -0.15pt 0pt 7.65pt"><span style="FONT-SIZE: 12pt; LETTER-SPACING: 0.1pt"><font size="2">KEPCO E&amp;C is responsible for the design of EU-APR1400 which will apply for the Design Certification of EUR. The EU-APR1400 will be an improved design of APR1400 with the necessary changes to enhance safety and to fully comply with European regulatory requirements.<br />
    <br />
    <font face="Times New Roman">The Contractor performs the following work activities:<br />
    <br />
    A. Preparation of requirements and operating experiences in European Countries<br />
    - Contractor prepares requirements for CCF in the safety-related electrical power system in European countries.<br />
    - Contractor prepares the operating experienced diversity design.<br />
    <br />
    B.&nbsp;Review of the KEPCO&rsquo;s diversity design<br />
    - Contractor reviews the KEPCO&rsquo;s diversity design method for the safetyrelated electrical power system.<br />
    - Contractor prepares recommendations or comments on the KEPCO&rsquo;s diversity design.<br />
    - Preparation of diversity design used in the NPPs in European countries<br />
    <br />
    The corresponding items that KEPCO wants to acquire information are as follows;<br />
    - Medium voltage bus / switchgear between safety trains<br />
    - Emergency Diesel Generator (EDG) and Station Black Out (SBO) generator<br />
    - Multi-function digital relay (applying 2 out of 3 logic scheme)<br />
    - Uninterruptible Power Supply (UPS) system (chargers, batteries, inverters, distribution panels, etc.)<br />
    <br />
    The Contractor prepares a report containing the outcomes performed in the work<br />
    activities in the above.</font><br />
    </font></span></div>

    Attachments