본문으로 바로가기

New Start, New Standard
Comments on Sole Source Contract

Customer Center
CustomerCenter > Bid Information > Pre-Bid Information > Comments on Sole Source Contract Search

All 523 Page 4/53

CustomerCenter > Bid Information > Pre-Bid Information > Comments on Sole Source Contract 목록 -Notice No., Notice Date, Contract Title, No. of Opinion, Status
Notice No. Notice Date Contract Title Status
493 2025-02-11 Technical consulting service for Estimation of Earthworks using GT Model on Dukovany Site Close
492 2025-01-24 Technical Service on Penetration Assembly located in Double Containment Building for APR1000 SDA Certification Close
491 2024-12-31 Technical Consultation for Extension of Design Life for Electrical Penetration Assembly(EPA) at Kori Units 3 and 4 Close
490 2024-10-24 Integrated Post Fire Safe Shutdown Analysis including Multiple Spurious Operation Analysis for Hanul 1&2 Close
489 2024-08-06 Technical Consultation on Review of the Leak Rate Model from the Containment Atmosphere to the Environment under Severe Accident Close
488 2024-08-01 Technical Consultation on Review of Appropriateness of PIPESTRESS User Training Material and PIPESTRESS-Based Piping Stress Analysis Modeling Standard Close
487 2024-07-12 Technical Consultation on Evaluation of In-Vessel Retention Performance for APR1000 Using In-Vessel Injection Close
486 2024-06-04 Technical Consultation on RAI Support Work for CFD Analysis of Hydrogen Risk Assessment of Saeul Unit 3&4 Close
485 2024-05-23 [Closed] Technical Consultation on 3-Dimensional CFD simulation for hydrogen distribution and.. Close
484 2024-03-11 Technical Service on Penetration Assembly located in Double Containment Building for APR1000 SDA Certification Close