본문으로 바로가기

New Start, New Standard
Comments on Sole Source Contract

Customer CenterComments on Sole Source Contract
Notice No. 445
Notice Date 2021-12-03
Contract Title Technical Consultation on Integrated Post-fire Safe Shutdown Analysis including Multiple Spurious Operation Analysis for SKN 5&6
Contract Overview Task 1. Integrated Post-fire Safe Shutdown Analysis including Multiple Spurious Operation Analysis
Task 1-1. Safe Shutdown Equipment List and Fault Tree Development
Task 1-2. Cable Selection by Detailed Circuit Analysis
Task 1-3. Fire Area Assessment
Task 1-4. Post-fire Safe Shutdown Analysis Report
Task 2. Support KEPCO E&C Work at Contractor’s Office in U.S.
Task 3. Technical Meeting at Contractor’s Office in U.S.
Task 4. RAI Support Service
Estimated Value 1,215,500 USD
Expected Completion Date 2023.03.31
Reason(s) for the Sole Sourcing The requirements for performing the above consulting service are as follows
- Experience in performing detailed circuit analysis applying the Wire by Wire Method, performing integrated post-fire safe shutdown analysis including multiple spurious operation analysis, and supporting Licensing
- Experience in developing NEI 00-01(Rev.4) which is the latest detailed circuit analysis methodology required for integrated post-fire safe shutdown analysis including multiple spurious operation analysis
- Experience in developing, modifying and technical support for software used for integrated post-fire safe shutdown analysis including multiple spurious operation analysis
JENSEN HUGHES is a sole company that meets the above requirements
Company to be Contracted JENSEN HUGHES
Name SH Lee
Dept Contract Team
Tel +82 54 421 3053
email sh.lee@kepco-enc.com
Attachments
  • pdf 첨부파일 Technical Information_MSO.pdf (147.02KB) Download