Customer Center

Technology for Earth, Energy for Human

Bid Notice

Bid No, Item for Bid, Notice Date, Deadline for Bid Submission, Content, Attachments가 있는 news detail 테이블입니다.
Bid No 41
Item for Bid Technical consultation for the Passive Condensate Heat Exchanger
Notice Date 2012-07-18
Deadline for Bid Submission 2012-07-22
Content <ul>
    <li><font face="Times New Roman">Task 1. Review of Passive Condensate Heat Exchanger Sizing in KEPCO E&amp;C Calculation</font><font face="Times New Roman"><br />
    &nbsp;Passive Condensate Heat Exchanger Sizing calculation provided by KEPCO-E&amp;C will be reviewed.<br />
    &nbsp;&nbsp; -&nbsp;Review of compare with PASCAL Test*<br />
    &nbsp;&nbsp; -&nbsp;Determine of Heat Transfer Area<br />
    &nbsp;&nbsp; -&nbsp;Determine of PCHX outside fouling factor<br />
    &nbsp;&nbsp; -&nbsp;Determine of PCHX inside fouling factor<br />
    &nbsp;&nbsp; -&nbsp;Determine of PCHX plugging margin<br />
    &nbsp;&nbsp; -&nbsp;Determine of Overall Heat Transfer Coefficient(W/m2K) and Heat Transfer(Q)</font> </li>
</ul>
<p><font face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; * PASCAL Test was performed at KAERI(Korea Atomic Energy Research Institute) in KOREA.&nbsp;<br />
</font></p>
<ul>
    <li><font face="Times New Roman">Task 2. Design Review Meeting<br />
    &nbsp;Based on an initial review of Passive Condensate Heat Exchanger Sizing in Task 1, a MPR review team will be established. This will include a Design Review Coordinator, a Cognizant Engineer, and a supporting team of reviewers.<br />
    MPR shall host a 5 day meeting at the MPR offices in Washington DC with KEPCO engineers to conduct a review of the PAFS.<br />
    &nbsp;&nbsp; -&nbsp;KEPCO Engineers would provide an overview of the design<br />
    &nbsp;&nbsp; -&nbsp;MPR engineers would present results of review of KEPCO calculation and Plan <br />
    The extent of the design review will be limited to the contents of the KEPCO calculation.</font> </li>
</ul>
<p>&nbsp;</p>
<ul>
    <li><font face="Times New Roman">Task 3. Final report documentation and results<br />
    The final report shall include:<br />
    &nbsp;&nbsp; -&nbsp;A review of Passive Condensate Heat Exchanger Sizing<br />
    &nbsp;&nbsp; -&nbsp;A review summary<br />
    &nbsp;&nbsp; -&nbsp;Conclusions and recommendations from the review. This section would identify problem areas<br />
    &nbsp;&nbsp; -&nbsp;All presentations made during the review</font> </li>
</ul>
<p>&nbsp;</p>
Attachments
  • Bid No
    41
    Item for Bid
    Technical consultation for the Passive Condensate Heat Exchanger
    Notice Date
    2012-07-18
    Deadline for Bid Submission
    2012-07-22
    Content

    <ul>
        <li><font face="Times New Roman">Task 1. Review of Passive Condensate Heat Exchanger Sizing in KEPCO E&amp;C Calculation</font><font face="Times New Roman"><br />
        &nbsp;Passive Condensate Heat Exchanger Sizing calculation provided by KEPCO-E&amp;C will be reviewed.<br />
        &nbsp;&nbsp; -&nbsp;Review of compare with PASCAL Test*<br />
        &nbsp;&nbsp; -&nbsp;Determine of Heat Transfer Area<br />
        &nbsp;&nbsp; -&nbsp;Determine of PCHX outside fouling factor<br />
        &nbsp;&nbsp; -&nbsp;Determine of PCHX inside fouling factor<br />
        &nbsp;&nbsp; -&nbsp;Determine of PCHX plugging margin<br />
        &nbsp;&nbsp; -&nbsp;Determine of Overall Heat Transfer Coefficient(W/m2K) and Heat Transfer(Q)</font> </li>
    </ul>
    <p><font face="Times New Roman">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; * PASCAL Test was performed at KAERI(Korea Atomic Energy Research Institute) in KOREA.&nbsp;<br />
    </font></p>
    <ul>
        <li><font face="Times New Roman">Task 2. Design Review Meeting<br />
        &nbsp;Based on an initial review of Passive Condensate Heat Exchanger Sizing in Task 1, a MPR review team will be established. This will include a Design Review Coordinator, a Cognizant Engineer, and a supporting team of reviewers.<br />
        MPR shall host a 5 day meeting at the MPR offices in Washington DC with KEPCO engineers to conduct a review of the PAFS.<br />
        &nbsp;&nbsp; -&nbsp;KEPCO Engineers would provide an overview of the design<br />
        &nbsp;&nbsp; -&nbsp;MPR engineers would present results of review of KEPCO calculation and Plan <br />
        The extent of the design review will be limited to the contents of the KEPCO calculation.</font> </li>
    </ul>
    <p>&nbsp;</p>
    <ul>
        <li><font face="Times New Roman">Task 3. Final report documentation and results<br />
        The final report shall include:<br />
        &nbsp;&nbsp; -&nbsp;A review of Passive Condensate Heat Exchanger Sizing<br />
        &nbsp;&nbsp; -&nbsp;A review summary<br />
        &nbsp;&nbsp; -&nbsp;Conclusions and recommendations from the review. This section would identify problem areas<br />
        &nbsp;&nbsp; -&nbsp;All presentations made during the review</font> </li>
    </ul>
    <p>&nbsp;</p>

    Attachments