Bid No 41
Item for Bid Technical consultation for the Passive Condensate Heat Exchanger
Notice Date 2012-07-18
Deadline for Bid Submission 2012-07-22
Content

  • Task 1. Review of Passive Condensate Heat Exchanger Sizing in KEPCO E&C Calculation

     Passive Condensate Heat Exchanger Sizing calculation provided by KEPCO-E&C will be reviewed.

       - Review of compare with PASCAL Test*

       - Determine of Heat Transfer Area

       - Determine of PCHX outside fouling factor

       - Determine of PCHX inside fouling factor

       - Determine of PCHX plugging margin

       - Determine of Overall Heat Transfer Coefficient(W/m2K) and Heat Transfer(Q)


              * PASCAL Test was performed at KAERI(Korea Atomic Energy Research Institute) in KOREA. 



  • Task 2. Design Review Meeting

     Based on an initial review of Passive Condensate Heat Exchanger Sizing in Task 1, a MPR review team will be established. This will include a Design Review Coordinator, a Cognizant Engineer, and a supporting team of reviewers.

    MPR shall host a 5 day meeting at the MPR offices in Washington DC with KEPCO engineers to conduct a review of the PAFS.

       - KEPCO Engineers would provide an overview of the design

       - MPR engineers would present results of review of KEPCO calculation and Plan

    The extent of the design review will be limited to the contents of the KEPCO calculation.


 



  • Task 3. Final report documentation and results

    The final report shall include:

       - A review of Passive Condensate Heat Exchanger Sizing

       - A review summary

       - Conclusions and recommendations from the review. This section would identify problem areas

       - All presentations made during the review


 