Bid No | 36 |
---|---|
Item for Bid | Consulting on Design Phase PSA of EU-APR1400 for the compliance of EUR and Finish YVL Requirements |
Notice Date | 2012-02-17 |
Deadline for Bid Submission | 2012-02-21 |
Content |
1. Review of EU-APR1400 PSA against EUR and YVL<font face="Times New Roman"><br />
2. Development and Review of PSA Methodologies<br /> <font face="Times New Roman">3. Consultation on Development of Full-Power Internal Events PSA<br /> 4. <font face="Times New Roman">Consultation on Development of Full-Power External Events, LPSD and Spent Fuel PSAs<br /> </font>5. <font face="Times New Roman">Development of Methodology for Incorporation of PSA Results into SSC Classification including risk-informed applications<br /> <br /> </font></font></font> |
Attachments |
-
- Bid No
- 36
- Item for Bid
- Consulting on Design Phase PSA of EU-APR1400 for the compliance of EUR and Finish YVL Requirements
- Notice Date
- 2012-02-17
- Deadline for Bid Submission
- 2012-02-21
- Content
-
1. Review of EU-APR1400 PSA against EUR and YVL<font face="Times New Roman"><br />
2. Development and Review of PSA Methodologies<br />
<font face="Times New Roman">3. Consultation on Development of Full-Power Internal Events PSA<br />
4. <font face="Times New Roman">Consultation on Development of Full-Power External Events, LPSD and Spent Fuel PSAs<br />
</font>5. <font face="Times New Roman">Development of Methodology for Incorporation of PSA Results into SSC Classification including risk-informed applications<br />
<br />
</font></font></font>
- Attachments
Prev List | Development of PAFS (Passive Auxiliary Feedwater System) in MAAP5 |
---|---|
Next List | Technical consultation for Diversity Design of EU-APR1400 Electrical System |