KEPCO E&C is preparing to take a new leap forward in the Gimcheon new office building.

Comments on Competitive Contract

Total 25 / Page 1 / 3

Comments on Competitive Contract
Notice No. Notice Date Item for Bid Opinion Submission Due Date
202003 2020-03-30 Engineering Review and Consulting Service for the Offshore Wind Turbine Substructures and Foundations of Jeju Hanlim Offshore Wind Farm Project 2020-04-03 18:00 (KST)
202002 2020-02-13 Technical Consultation for Optimum Flaw Evaluation Methodology of Reactor Vessel Internal 2020-02-18 18:00 (KST)
202001 2020-02-11 Technical Service on Seismic Probabilistic Risk Assessment for Shin Wolsong Unit 1&2 Nuclear Power Plants 2020-02-16 18:00 (KST)
201907 2019-12-16 Consulting Services on Flow/Structural Analysis Methodology for Comprehensive Vibration Assessment Program of Small Modular Reactor 2019-12-21 18:00 (KST)
201906 2019-05-31 Technical Consulting Service for Development of Methodology for Evaluation of Derived Concentration Guideline Level (DCGL) 2019-06-04, 18:00 (KST)
201905 2019-04-17 Technical Consulting Service on the Other External Hazard Development for Screening 2019-04-21, 18:00 (KST)
201904 2019-04-12 (Urgency) Technical Service for the Operation, Maintenance and Commercialization of the Ulsan Floating Offshore Wind Farm Project 2019-04-14, 18:00 (KST)
201903 2019-04-02 Technical Service for the Operation, Maintenance and Commercialization of the Ulsan Floating Offshore Wind Farm Project 2019-04-06, 18:00 (KST)
201902 2019-03-13 Technical Consultation on Decommissioning Radioactive Waste Management for PHWR 2019-03-17, 18:00 (KST)
201901 2019-02-12 (Urgency) Technical Consultation for Development of In-service Inspection Specification and Procedure for Prestressed Concrete Containment with Grouted Tendon 2019-02-14, 18:00 (KST)
  1. 1
  2. 2
  3. 3
  1. 1
  2. 2
  3. 3