KEPCO E&C is preparing to take a new leap forward in the Gimcheon new office building.

Bid Notice

Total 80 / Page 1 / 8

Bid Notice
Bid No Item for Bid Notice Date Deadline for Bid Submission
ITB20-KCN-01 Consulting Services on Flow/Structural Analysis Methodology for Comprehensive Vibration Assessment Program of Small Modular Reactor 2020-02-17 2020-03-10
201906 Technical Consulting Service for Development of Methodology for Evaluation of Derived Concentration Guideline Level (DCGL) 2019-06-14 2019-07-05
201905 Technical Consulting Service on the Other External Hazard Development for Screening Basis and Analysis 2019-05-29 2019-06-19
201904 Technical Service for the Operation, Maintenance and Commercialization of the Ulsan Floating Offshore Wind Farm Project 2019-04-30 2019-05-21
201903 Technical Consultation on Decommissioning Radioactive Waste Management for PHWR 2019-04-11 2019-05-02
201902 Technical Consultation for Development of In-service Inspection Specification and Procedure for Prestressed Concrete Containment with Grouted Tendon 2019-02-27 2019-03-20
201901 Development of Functional Requirements Analysis (FRA) / Function Allocation (FA) to optimize I&C architecture design to comply with I&C design process based on IEC 61513 2019-01-21 2019-02-11
201814 Technical Consultation for Development of In-service Inspection Specification and Procedure for Prestressed Concrete Containment with Grouted Tendon 2018-11-23 2018-12-17
201813 Technical Consulting Service for Development of Failure Detection Technology for Safety Digital I&C Platform & Optimization of Safety I&C Architecture 2018-10-19 2018-11-12
201812 [Second Notice] Technical Consulting for Evaluation of Containment Penetrated Equipment 2018-09-28 2018-10-12