Bid Notice
Bid No | 49 |
---|---|
Item for Bid | Contract for Consulting Services for I&C System Technical Reports for APR1400 NRC DC |
Notice Date | 2014-05-16 |
Deadline for Bid Submission | 2014-05-20 |
Content |
The Contractor shall provide the following consulting services. A.2.1 Control System CCF Analysis Technical Report The Contractor shall provide initial guidance for preparation of the Control System CCF Analysis TeR for APR1400 I&C design, to be prepared by KEPCO E&C, against the up-to-date codes & regulations and the latest NRC positions on the related subject. The Contractor shall provide review and comment on the TeR prepared by KEPCO E&C. A.2.2 Control System CCF DCD Changes A.2.3 Control System CCF NRC Meeting Preparation The Contractor shall provide initial guidance for preparation of the Control System CCF presentation or other material to be prepared by KEPCO E&C for the following NRC meetings: The Contractor shall provide review and comment on the material prepared by KEPCO E&C for NRC meetings, above. A.2.4 Consultation Review Meeting The Contractor and KEPCO E&C shall have one review meeting (2 days right before or right after the PARM August, 2014) at Washington DC to review the first draft Control System CCF TeR and Safety System Response Time TeR and the presentation material for the PARM on August, 2014. Contractor shall prepare meeting notes and summary. A.2.5 Control System CCF and Safety System Response Time Final report The Contractor shall submit a “Final Report” summarizing the whole services and referencing the consultation activities during the contract period. The final report shall be issued before the end of contract period. A.2.6 Meetings with NRC A.2.7 Safety System Response Time Analysis Technical Report The Contractor shall provide initial guidance for preparation of the Safety System Response Time Analysis TeR for APR1400 I&C design, to be prepared by KEPCO E&C, against the up-to-date codes & regulations and the latest NRC positions on the related subject. The Contractor shall provide review and comment on the TeR prepared by KEPCO E&C. A.2.8 Safety System Response Time NRC Meeting Preparation The Contractor shall provide initial guidance for preparation of the Safety System Response Time presentation or other material to be prepared by KEPCO E&C for the following NRC meetings: The Contractor shall provide review and comment on the material prepared by KEPCO E&C for NRC meetings, above. |
Attachments |
|