1991-2000

About KEPCO E&C1991-2000
1991 - 2000

Strengthen the Competitiveness Based on the Technology

  1. 2000
    10 Awarded Engineering Service Contract for Dangjin Power Plant Units 5 & 6 and Yeongwol Thermal Power Plant Unit 3
    09 Acquired Patent for Low-Temperature Denitrification Catalyst Technology
    06 Received "CNS John S.Hewitt Team Achievement Award" from Canada (Wolsong Nuclear Power Plant Units 2, 3 & 4
    03 Sold Probabilistic Risk Assessment Program Software (FORTE) to the U.S. NASA
  2. 1999
    (1999.12.28)3-15 KEDO 원전 협력계약체결 서명식
    12 Awarded A/E and NSSS Contract for KEDO Nuclear Power Plant
    10 Awarded Contract for Development of Fluid System Design Technology for Integral Reactor SMART
    09 Awarded Contract for Research & Development on Korean Next Generation Reactor(Phase III)
    08 Awarded Contract for the Turnkey Construction of the 500kV Substation in Ilijan, the Philippines
  3. 1998
    10 Awarded Contract for Feasibility Study of Constructing Coal Fired Thermal Power Plant in Mongolia
    09 Awarded Contract for Life Assessment of Major Equipments and Analysis of Aging Management Methods
    01 Awarded Contract for Design Improvements in Korean Standard Nuclear Power plant (KSNP) (1000㎿)
    01 Started Operation of EDMS (Electronic Document Service Contract Management System)
  4. 1997
    05 Awarded Engineering Service Contract for LG Bugok Combined Cycle Power Plant
    02 Awarded Engineering Service Contract for Taean Thermal Power Plant Units 5 & 6
    02 Awarded NSSS Design Contract for Hanbit Units 5 & 6
    02 Awarded NSSS Design Contract for Hanul Units 3 & 4
    01 Acquired NSSS Design Contract from Korea Atomic Energy Research Institute(KAERI)
  5. 1996
    12 Received the “Project of the Year Award” from the U.S. Magazine Power Engineering International (Taean Units 1 & 2)
    12 Received “World’s Best Power Plant Award” from the U.S. Magazine Electric Power International (Boryeong Units 3 & 4)
    07 Awarded Contract for Research & Development on Korean Next Generation Reactor (Phase II)
    04 Awarded Engineering Service Contract for ROMM (Rehabilitation, Operation, Maintenance, and Management) of Malaya Thermal Power Plant Units 1 & 2 in the Philippines
    01 Awarded Engineering Service Contract for FGD System in B-C Oil Fired Thermal Power Plant
  6. 1995
    (1995.11.09)용인 사옥 준공식
    12 Received the “Project of the Year Award” from Power Engineering International (Hanbit Units 3 & 4)
    10 Completed the Construction of Yongin Office Building and Relocated into It
    09 Awarded Engineering Service Contract for the Construction of G-7 FGD Demonstration System
    05 Awarded A/E Contract for Yeongheung Thermal Power Plant Units 1 & 2
    03 Awarded A/E Contract for Hanbit Nuclear Power Plant Units 5 & 6
  7. 1994
    (1994.06.22)보령화력 발전소 준공
    12 Awarded Contract for the Construction of Desulfurization System for Yeongdong Thermal Power Plant Unit 1
    11 Awarded Project Management Consulting Services Contract for the Incheon International Airport Construction Project
    06 Awarded Contract for R&D on PSA (Probabilistic Safety Assessment) of Hanbit Units 5 & 6
    03 Awarded Contract for the Comparison Assessment of Spent Fuel Interim Storage Methods
  8. 1993
    05 Began the Construction of KEPCO E&C Information Center and Power Technology R&D Center
    05 Awarded Engineering Service Contract for Construction of Donghae Thermal Power Plant
    04 Awarded Project Management Supervision Services Contract for Korea Train eXpress (KTX) Project
    01 Awarded Contract for Technological Support in Multipurpose Research Reactor Construction Project
  9. 1992
    (1992.02.26)CAD 장비 증설 및 LAN 가동식
    12 Awarded Contract for Research & Development on Korean Next Generation Reactor (Phase I)
    11 Established and Operated LAN (Connected to 255 PCs) for OA
    09 Awarded A/E Contract for Wolsong Nuclear Power Plant Units 3 & 4
    02 Proclamation of K-SPEC•2000, and Corporate Philosophy
  10. 1991
    (1991.08.19)3-2 KEDO 원전부지 정지공사 착공식
    11 Signed Contract for Pyeongtaek Combined Cycle Power Plant Engineering Service
    07 Developed Integrated Monitoring System to Extend Life of Nuclear Power Plant
    07 Awarded A/E Contract for Hanul Nuclear Power Plant Units 3 & 4
    03 Awarded Engineering Service Contract for Seoincheon Combined Cycle Power Plant