New Start, New Standard
Comments on Sole Source Contract
Comments on Sole Source Contract
Notice No. | 366 |
---|---|
Notice Date | 2018-03-28 |
Contract Title | The Multiple Spurious Operation(MSO) and Detailed Circuit Analysis for Barakah NPP in 2018 |
Contract Overview | The objective of the service is to perform Multiple Spurious Operation(MSO) Analysis according to the resent design change which has been made to the Reactor Coolant Gas Vent System at BNPP to remove valve 1-433-V-0418, 1-433-V-0419, and 1-433-V-0420 and to remove the flow path to the Reactor Drain Tank(RDT). |
Estimated Value | AED 159,955.45(US$43,550) |
Expected Completion Date | TBD |
Reason(s) for the Sole Sourcing |
The main concerns for this service at the moment are i) possibility for the completion of MSO re-analysis and the issue of revised MSO report according to RCGVS design change on time which means at a point of previous operation license on BNPP project, ii) meeting quality and R.G 1.189 requirement, iii) consistency for the result of pre-MSO analysis. Engineering Planning and Management, Inc (EPM) is one of the specialty companies for the Multiple Spurious Operation (MSO) analysis and has many experiences in USA and CANADA. EPM conducted the multiple spurious operation analysis following the contract period which is from August, 2014 to December, 2016. In addition, EPM can maintain the consistency with previous result of MSO using SAFE code which is developed by EPM on BNPP project. Based on the review of technical capability and expertise, EPM is considered as a proper organization to perform this task. |
Company to be Contracted | Engineering Planning and Management, Inc (EPM) |
Name | 강성훈 |
Dept | Nuclear Engineering Group |
Tel | (82)-54-421-3427 |
Ksh1927@kepco-enc.com | |
Attachments |
|