Notice No. | 381 |
---|---|
Notice Date | 2018-08-17 |
Contract Title | Technical Consulting Service on Thermal Hydraulic Analysis of Preliminary Scoping PSA at Power for Conceptual Design of iPOWER |
Contract Overview |
The tasks of this technical consulting service include the thermal hydraulic analysis for preliminary scoping Level 1 and 2 PSA at Power for iPOWER. The detailed deion for each sub-task is presented below : Task 1 - Technical Consulting Service for Level 1 PSA at Power - Develop the MAAP5 Model for the Level 1 Internal Events PSA at Power - Modeling and T/H analysis of Representative Sequences - Resolution of KEPCO E&C Review Comments and Submission of Final Report Task 2 - Technical Consulting Service for Level 2 PSA - Severe accident phenomena analysis for Level 2 PSA at Power including source term evaluation - Resolution of KEPCO E&C Review Comments and Submission of Final Report Task 3 - Technical meetings |
Estimated Value | USD 135,250 |
Expected Completion Date | 2019-07-31 |
Reason(s) for the Sole Sourcing |
It is necessary for the contractor to have experiences on various licensing applications in the above technical fields as well as highly qualified and experienced engineers who can provide improvement of MAAP analysis model. FAI is the only contractor that can meet the above requirements because FAI is the original MAAP developer. |
Company to be Contracted | Fauske & Associates, LLC (FAI) |
Name | 김원직 |
Dept | Integrated Safety Assessment Department |
Tel | 82-54-421-3593 |
kwj29@kepco-enc.com | |
Attachments |
|