Notice No. 411
Notice Date 2019-11-13
Contract Title Technical Consulting on the CLP design method improvement and repair method for corroded CLP of NPPs
Contract Overview Tthis contract is about technical consulting on the CLP design method improvement and repair method for corroded CLP of NPPs.
ASME Section III, Division 2, Subsection CC, table CC-3720-1 shows the allowable strains of membrane and combined membrane and bending, and the calculated strains for the liner shall not exceed the values given in this table.
However, the allowable stresses for the combined membrane and bending strain for the idealized liner local bending deformation
is deemed to be very conservative.
In addition, there were found some corroded CLP in OPR1000 NPPs and it is necessary to investigate examples of CLP repair performed for US or international operating nuclear power plants to achive optimized repair method.
Estimated Value USD 33,088
Expected Completion Date 2020-4-30
Reason(s) for the Sole Sourcing Sargent & Lundy (S&L) is a global leading architectural engineering company in the world and it carried out a lot of projects in the world with many outstanding experts in the structural engineering field. Specifically KEPCO E&C's CLP calculations are based on those of the S&L, and it also provided several technical consulting services about CLP issues recently.

So, S&L is the only contractor to perform this project successfully considering the short project period of 5 months and its technical experiences sharing with KEPCO E&C.
Company to be Contracted Sargent & Lundy
Name 조훈인
Dept Civil and Architectural Engineering Dept.
Tel 82-54-421-6115
email hoonin.cho@kepco-enc.com
Attachments
  • pdf 첨부파일 Attachment 2. Technical Information (CLP Design Improvement) Draft R1.pdf (271.86KB) Download

콘텐츠 만족도 조사

담당자 정보

  • Dep.
    Finance Team. DONG HYUN-YI
  • Tel
    +82-54-421-8736