Comments on Sole Source Contract
Comments on Sole Source Contract
Notice No. | 411 |
---|---|
Notice Date | 2019-11-13 |
Contract Title | Technical Consulting on the CLP design method improvement and repair method for corroded CLP of NPPs |
Contract Overview |
Tthis contract is about technical consulting on the CLP design method improvement and repair method for corroded CLP of NPPs. ASME Section III, Division 2, Subsection CC, table CC-3720-1 shows the allowable strains of membrane and combined membrane and bending, and the calculated strains for the liner shall not exceed the values given in this table. However, the allowable stresses for the combined membrane and bending strain for the idealized liner local bending deformation is deemed to be very conservative. In addition, there were found some corroded CLP in OPR1000 NPPs and it is necessary to investigate examples of CLP repair performed for US or international operating nuclear power plants to achive optimized repair method. |
Estimated Value | USD 33,088 |
Expected Completion Date | 2020-4-30 |
Reason(s) for the Sole Sourcing |
Sargent & Lundy (S&L) is a global leading architectural engineering company in the world and it carried out a lot of projects in the world with many outstanding experts in the structural engineering field. Specifically KEPCO E&C's CLP calculations are based on those of the S&L, and it also provided several technical consulting services about CLP issues recently. So, S&L is the only contractor to perform this project successfully considering the short project period of 5 months and its technical experiences sharing with KEPCO E&C. |
Company to be Contracted | Sargent & Lundy |
Name | 조훈인 |
Dept | Civil and Architectural Engineering Dept. |
Tel | 82-54-421-6115 |
hoonin.cho@kepco-enc.com | |