Major Projects(Nuclear)
Project Name | Customer | Project Period |
---|---|---|
Preparation of Abnormal Operation Manual for Qinsan NPP Units 1 & 2 |
AECL |
1998.09.01~2000.05.3 |
Feasibility Survey and Training Service to Apply I&C Technology of Siemens, Germany to Korean NPP |
Siemens |
1999.03.18~2001.05.31 |
Technological Support for Lungmen NPP in Taiwan |
S&W |
1999.07.27~2004.07.26 |
Personnel Support for Qinsan NPP in China |
AECL |
1999.07.29~2003.10.31 |
Professional Technological Service for the Engineering Support for AECL |
AECL |
1999.09.22~2000.04.30 |
Technological Support for S&L |
S&L |
1999.10.04~2001.12.31 |
Safety Review of CANDU 9 NSSS |
AECL |
2000.01.01~2000.06.30 |
Assessment of Design Safety and Joint Engineering for CANDU 9 |
AECL |
2000.01.01~2001.02.28 |
Technological Support for Bechtel |
Bechtel |
2000.07.06~2004.07.05 |
Technological Support for Core Protection Calculator System of APS’s Palo Verde NPP in USA |
WEC |
2001.08.20~2002.08.19 |
Consultation Service for the Implementation of International Reactor Physics Experiments Project of OECD/NEA |
OECD/NEA |
2002.12.02~2005.02.28 |
Technological Advice on Construction of Lindgong NPP in China |
Guangdong NPP |
2003.03.14~2008.03.02 |
Technical Personnel Support for Golder |
GA |
2003.06.07~2005.06.07 |
Technical Service for Stone & Webster |
S&W |
2003.12.17~2010.12.16 |
Technological Support for Maintenance on Westinghouse’s Power Plants being Operated. |
WEC |
2004.05.03~2005.05.31 |
Engineering Service for NuStart AP1000 COL in USA |
WEC |
2005.10.31~2007.12.31 |
Environmental Engineering for Ling Ao Phase II NPP Main Control Room, China |
LDNPC |
2006.06.28~2008.12.31 |
Technological Support for the Improvement of Fuel Handling Facilities of PaR Nuclear, USA |
PaR Nuclear |
2006.07.25~2013.07.01 |
Technological Support for Bechtel, USA |
Bechtel |
2007.06.07~2014.09.30 |
Technological Support for ACR-1000 Reactor Physics |
AECL |
2007.06.25~2007.11.30 |
Detailed Engineering of Integrated Licensing for Westinghouse’s AP1000, USA |
WEC |
2008.03.31~2010.12.31 |
Engineering Support Service for the Installation of ITER Electrical Devices |
ITER |
2008.10.09~2010.10.08 |
Engineering Service for the Replacement of 1st Coolant System of Research Reactors in Greece |
Demokritos |
2009.06.01~2011.05.31 |
Preliminary Feasibility Survey for the First NPP in Malaysia |
TNB |
2009.06.17~2010.06.16 |
A/E Service for Barakah NPP in UAE |
ENEC |
2010.03.25~2020.12 |
Reactor System Engineering Service for Barakah NPP in UAE |
ENEC |
2010.06.30~2020.05.01 |
Reactor System Engineering Service for Barakah NPP in UAE |
TNBR |
2010.07.01~2011.01.31 |
Advisory Service for Preparing Bid Proposals for Cernavoda NPP Units 3 & 4, Romania |
AtomTechnoProm |
2011.12.26.~2012.03.30 |
Supporting Service for ITER Cable Engineering |
ITER IO |
2012.04.30.~2017.04.30 |
Final Engineering, Procurement, Trial Operation, and Maintenance Service for ITER Central Interlocking Device |
ITER IO |
2013.09.25.~2017.04.30 |
ITER Detailed Design of CODAC, CIS and CSS Network Infrastructure |
ITER |
2012.04~2017.04 |
ITER CIS Final Design, Procurement, Commissioning and Maintenance |
ITER |
2012.04~2017.04 |
Pre-Feasibility Study for Nuclear Power Project in Vietnam |
EVN |
2013.06~2016.06 |
ITER Construction Management as Agent Services |
ITER |
2016.06~2026.06 |
Long Term Engineering Agreenment relating to the Barakah NPP |
Nawah Energy Company |
2018.01~2031.01 |
Darlington Refurbishment Retube and Feeder Replacement Project |
SNC-Lavalin |
2015.09~2021.08 |
BNPP simulator NAPS Software License Agreement |
WSC |
2018.10~2020.04 |
KHNP MTP Project |
WEC |
2018.12~2020.08 |
Site Assessment and Characteristics Survey for the First NPP in Jordan |
JAEC |
2014.11.30.~2017.11.30 |
-
- Project Name
- Preparation of Abnormal Operation Manual for Qinsan NPP Units 1 & 2
- Customer
- AECL
- Project Period
- 1998.09.01~2000.05.3
-
- Project Name
- Feasibility Survey and Training Service to Apply I&C Technology of Siemens, Germany to Korean NPP
- Customer
- Siemens
- Project Period
- 1999.03.18~2001.05.31
-
- Project Name
- Technological Support for Lungmen NPP in Taiwan
- Customer
- S&W
- Project Period
- 1999.07.27~2004.07.26
-
- Project Name
- Personnel Support for Qinsan NPP in China
- Customer
- AECL
- Project Period
- 1999.07.29~2003.10.31
-
- Project Name
- Professional Technological Service for the Engineering Support for AECL
- Customer
- AECL
- Project Period
- 1999.09.22~2000.04.30
-
- Project Name
- Technological Support for S&L
- Customer
- S&L
- Project Period
- 1999.10.04~2001.12.31
-
- Project Name
- Safety Review of CANDU 9 NSSS
- Customer
- AECL
- Project Period
- 2000.01.01~2000.06.30
-
- Project Name
- Assessment of Design Safety and Joint Engineering for CANDU 9
- Customer
- AECL
- Project Period
- 2000.01.01~2001.02.28
-
- Project Name
- Technological Support for Bechtel
- Customer
- Bechtel
- Project Period
- 2000.07.06~2004.07.05
-
- Project Name
- Technological Support for Core Protection Calculator System of APS’s Palo Verde NPP in USA
- Customer
- WEC
- Project Period
- 2001.08.20~2002.08.19
-
- Project Name
- Consultation Service for the Implementation of International Reactor Physics Experiments Project of OECD/NEA
- Customer
- OECD/NEA
- Project Period
- 2002.12.02~2005.02.28
-
- Project Name
- Technological Advice on Construction of Lindgong NPP in China
- Customer
- Guangdong NPP
- Project Period
- 2003.03.14~2008.03.02
-
- Project Name
- Technical Personnel Support for Golder
- Customer
- GA
- Project Period
- 2003.06.07~2005.06.07
-
- Project Name
- Technical Service for Stone & Webster
- Customer
- S&W
- Project Period
- 2003.12.17~2010.12.16
-
- Project Name
- Technological Support for Maintenance on Westinghouse’s Power Plants being Operated.
- Customer
- WEC
- Project Period
- 2004.05.03~2005.05.31
-
- Project Name
- Engineering Service for NuStart AP1000 COL in USA
- Customer
- WEC
- Project Period
- 2005.10.31~2007.12.31
-
- Project Name
- Environmental Engineering for Ling Ao Phase II NPP Main Control Room, China
- Customer
- LDNPC
- Project Period
- 2006.06.28~2008.12.31
-
- Project Name
- Technological Support for the Improvement of Fuel Handling Facilities of PaR Nuclear, USA
- Customer
- PaR Nuclear
- Project Period
- 2006.07.25~2013.07.01
-
- Project Name
- Technological Support for Bechtel, USA
- Customer
- Bechtel
- Project Period
- 2007.06.07~2014.09.30
-
- Project Name
- Technological Support for ACR-1000 Reactor Physics
- Customer
- AECL
- Project Period
- 2007.06.25~2007.11.30
-
- Project Name
- Detailed Engineering of Integrated Licensing for Westinghouse’s AP1000, USA
- Customer
- WEC
- Project Period
- 2008.03.31~2010.12.31
-
- Project Name
- Engineering Support Service for the Installation of ITER Electrical Devices
- Customer
- ITER
- Project Period
- 2008.10.09~2010.10.08
-
- Project Name
- Engineering Service for the Replacement of 1st Coolant System of Research Reactors in Greece
- Customer
- Demokritos
- Project Period
- 2009.06.01~2011.05.31
-
- Project Name
- Preliminary Feasibility Survey for the First NPP in Malaysia
- Customer
- TNB
- Project Period
- 2009.06.17~2010.06.16
-
- Project Name
- A/E Service for Barakah NPP in UAE
- Customer
- ENEC
- Project Period
- 2010.03.25~2020.12
-
- Project Name
- Reactor System Engineering Service for Barakah NPP in UAE
- Customer
- ENEC
- Project Period
- 2010.06.30~2020.05.01
-
- Project Name
- Reactor System Engineering Service for Barakah NPP in UAE
- Customer
- TNBR
- Project Period
- 2010.07.01~2011.01.31
-
- Project Name
- Advisory Service for Preparing Bid Proposals for Cernavoda NPP Units 3 & 4, Romania
- Customer
- AtomTechnoProm
- Project Period
- 2011.12.26.~2012.03.30
-
- Project Name
- Supporting Service for ITER Cable Engineering
- Customer
- ITER IO
- Project Period
- 2012.04.30.~2017.04.30
-
- Project Name
- Final Engineering, Procurement, Trial Operation, and Maintenance Service for ITER Central Interlocking Device
- Customer
- ITER IO
- Project Period
- 2013.09.25.~2017.04.30
-
- Project Name
- ITER Detailed Design of CODAC, CIS and CSS Network Infrastructure
- Customer
- ITER
- Project Period
- 2012.04~2017.04
-
- Project Name
- ITER CIS Final Design, Procurement, Commissioning and Maintenace
- Customer
- ITER
- Project Period
- 2012.04~2017.04
-
- Project Name
- Pre-Feasibility Study for Nuclear Power Project in Vietnam
- Customer
- EVN
- Project Period
- 2013.06~2016.06
-
- Project Name
- ITER Construction Management as Agent Services
- Customer
- ITER
- Project Period
- 2016.06~2026.06
-
- Project Name
- Long Term Engineering Agreenment relating to the Barakah NPP
- Customer
- Nawah Energy Company
- Project Period
- 2018.01~2031.01
-
- Project Name
- Darlington Refurbishment Retube and Feeder Replacement Project
- Customer
- SNC-Lavalin
- Project Period
- 2015.09~2021.08
-
- Project Name
- BNPP simulator NAPS Software License Agreement
- Customer
- WSC
- Project Period
- 2018.10~2020.04
-
- Project Name
- KHNP MTP Project
- Customer
- WEC
- Project Period
- 2018.12~2020.08
-
- Project Name
- Site Assessment and Characteristics Survey for the First NPP in Jordan
- Customer
- JAEC
- Project Period
- 2014.11.30.~2017.11.30
Major Projects(Thermal & Others)
Project Name | Customer | Project Period | Task |
---|---|---|---|
Advice for the Construction to Improve Performance of Transmission |
Myanmar Electric Power Enterprise (MEPE) |
1996.06~2000.12 |
Technology Advice for Business |
Technology Advice for Business Owner |
Bangladesh Power Development Board |
1996.06~2003.08 |
Technology Advice for Business |
Engineering Service for Hirgigo Internal Combustion Generation Power Plant (22MWx4) in Eriteria |
Eriteria Electric Power Authority |
1997.04~2004.01 |
Design Engineering |
Human Resources Support Service |
Burns & McDonnell |
1999.05~2002.06 |
- |
Technology Support for the Business Owner of Ilijan CCPP in the |
KEPCO Ilijan Corporation |
1999.06~2002.07 |
Technology Advice for Business |
Technology Support for the Business Owner of Ilijan CCPP in the |
KEPCO Ilijan Corporation |
1999.10~2000.10 |
Technology Advice for Business |
Construction of Diesel Fuel Unloading Terminal at the Wharf for Ilijan CCPP in the Philippines |
Washington Group International |
2000.02~2001.09 |
EPC |
Engineering Service in Electricity Field for Fujairah CCPP in the |
UAE Offset Group |
2001.09~2003.12 |
Design Engineering |
Engineering Service for 500MW Brooks Coal Fired |
Joint Venture(Parsons, Acres, Colt) |
2001.10~2002.02 |
Design Engineering |
Control and Protection Facilities for the Sawamlah & Al-Leith |
SEC(BEMCO) |
2002.09~2003.07 |
Engineering, and Supplying |
Control and Protection Facilities for the Safa Substation in Saudi Arabia |
SEC(BEMCO) |
2003.09~2004.11 |
Engineering, and Supplying |
Switchyard for ARAMCO Combined Heat & Power Plant in Saudi |
Mitsui(Hyundai Heavy Industries) |
2004.02~2006.11 |
Engineering, and Supplying |
Engineering Service for the AFAM VI CCPP in Nigeria |
Daewoo E&C |
2005.11~2009.12 |
Design Engineering |
Construction Management Service for the New City Development |
World City |
2005.11~2011.06 |
CM Service |
Human Resources Support Service |
Burns & McDonnell |
2006.12~2007.12 |
- |
Construction for Misurata & Benghazi CCPP in Libya |
Daewoo E&C |
2007.08~2011.06 |
Design Engineering |
Engineering Advice for MUNDRA Ultra Mega Power Plant in India |
Coastal Gujarat Power |
2007.10~2013.12 |
Technology Advice for |
Technology Support for the Business Owner of Cirebon Coal Fired |
PT Cirebon Electric Power |
2008.04~2011.08 |
Technology Advice for |
Engineering Service for Shuweihat S2 CCPP in the UAE |
Samsung C&T |
2008.10~2011.09 |
Design Engineering |
Technology Advice for the Business Owner of Nghi Son 2 Coal Fired |
KEPCO |
2009.02~2011.06 |
Technology Advice for |
Power Project Engineering Consulting Service in Iraq |
KNOC |
2009.07~2013.05 |
Technology Advice for |
Engineering Service for Jorf Lasfar Coal Fired Thermal Power Plant in |
Daewoo W&C |
2010.06~2014.04 |
Design Engineering |
Engineering Service for Santa Maria Coal Fired Thermal Power Plant in Chile |
POSCO E&C |
2010.07~2014.02 |
Design Engineering |
Engineering Service for S3 CCPP in the UAE |
Daewoo E&C |
2011.03~2014.06 |
Design Engineering |
Engineering Technology Service for Tufanbeyli Coal Fired Thermal |
SK E&C |
2010.11~2015.02 |
Design Engineering |
Ghana Takoradi T2 Power Plant Expansion EPC Project |
Takoradi Int'I Co. |
2011.12~2014.12 |
EPC |
Installation of a Once - Through Sea Water Cooling System for the Takoradi T1 Power Plant EPC Project |
Volta River Authority |
2013.01~2015.09 |
EPC |
CIPREL IV Volet B EPC Project |
CIPREL POWER |
2013.02~2016.03 |
EPC |
Design Engineering Services of Libya's Zwitina Add-on Plant |
DAEWOO E&C |
2010.08~2013.08 |
Design Engineering |
-
- Project Name
- Advice for the Construction to Improve Performance of Transmission and Distribution Lines in Myanmar
- Customer
- Myanmar Electric Power Enterprise (MEPE)
- Project Period
- 1996.06~2000.12
- Task
- Technology Advice for Business Owner
-
- Project Name
- Technology Advice for Business Owner
- Customer
- Bangladesh Power Development Board(BPDB)
- Project Period
- 1996.06~2003.08
- Task
- Technology Advice for Business Owner
-
- Project Name
- Engineering Service for Hirgigo Internal Combustion Generation Power Plant (22MWx4) in Eriteria
- Customer
- Eriteria Electric Power Authority(HSD Engine)
- Project Period
- 1997.04~2004.01
- Task
- Design Engineering
-
- Project Name
- Human Resources Support Service
- Customer
- Burns & McDonnell
- Project Period
- 1999.05~2002.06
- Task
- -
-
- Project Name
- Technology Support for the Business Owner of Ilijan CCPP in the Philippines
- Customer
- KEPCO Ilijan Corporation
- Project Period
- 1999.06~2002.07
- Task
- Technology Advice for Business Owner
-
- Project Name
- Technology Support for the Business Owner of Ilijan CCPP in the Philippines
- Customer
- KEPCO Ilijan Corporation
- Project Period
- 1999.10~2000.10
- Task
- Technology Advice for Business Owner
-
- Project Name
- Construction of Diesel Fuel Unloading Terminal at the Wharf for Ilijan CCPP in the Philippines
- Customer
- Washington Group International
- Project Period
- 2000.02~2001.09
- Task
- EPC
-
- Project Name
- Engineering Service in Electricity Field for Fujairah CCPP in the
- Customer
- UAE Offset Group(Doosan Heavy Industries & Construction)
- Project Period
- 2001.09~2003.12
- Task
- Design Engineering(Electric Field)
-
- Project Name
- Engineering Service for 500MW Brooks Coal Fired Thermal Power Plant in Canada (Phase 1)
- Customer
- Joint Venture(Parsons, Acres, Colt)
- Project Period
- 2001.10~2002.02
- Task
- Design Engineering
-
- Project Name
- Control and Protection Facilities for the Sawamlah & Al-Leith Substation in Saudi Arabia
- Customer
- SEC(BEMCO)
- Project Period
- 2002.09~2003.07
- Task
- Engineering, and Supplying Materials and Equipment
-
- Project Name
- Control and Protection Facilities for the Safa Substation in Saudi Arabia
- Customer
- SEC(BEMCO)
- Project Period
- 2003.09~2004.11
- Task
- Engineering, and Supplying Materials and Equipment
-
- Project Name
- Switchyard for ARAMCO Combined Heat & Power Plant in Saudi Arabia
- Customer
- Mitsui(Hyundai Heavy Industries)
- Project Period
- 2004.02~2006.11
- Task
- Engineering, and Supplying Materials and Equipment
-
- Project Name
- Engineering Service for the AFAM VI CCPP in Nigeria
- Customer
- Daewoo E&C
- Project Period
- 2005.11~2009.12
- Task
- Design Engineering
-
- Project Name
- Construction Management Service for the New City Development Project in Phenom Penh, Cambodia
- Customer
- World City
- Project Period
- 2005.11~2011.06
- Task
- CM Service
-
- Project Name
- Human Resources Support Service
- Customer
- Burns & McDonnell
- Project Period
- 2006.12~2007.12
- Task
- -
-
- Project Name
- Construction for Misurata & Benghazi CCPP in Libya
- Customer
- Daewoo E&C
- Project Period
- 2007.08~2011.06
- Task
- Design Engineering
-
- Project Name
- Engineering Advice for MUNDRA Ultra Mega Power Plant in India
- Customer
- Coastal Gujarat Power
- Project Period
- 2007.10~2013.12
- Task
- Technology Advice for Business Owner
-
- Project Name
- Technology Support for the Business Owner of Cirebon Coal Fired Thermal Power Plant in Indonesia
- Customer
- PT Cirebon Electric Power
- Project Period
- 2008.04~2011.08
- Task
- Technology Advice for Business Owner
-
- Project Name
- Engineering Service for Shuweihat S2 CCPP in the UAE
- Customer
- Samsung C&T
- Project Period
- 2008.10~2011.09
- Task
- Design Engineering
-
- Project Name
- Technology Advice for the Business Owner of Nghi Son 2 Coal Fired Thermal Power Plant in Vietnam
- Customer
- KEPCO
- Project Period
- 2009.02~2011.06
- Task
- Technology Advice for Business Owner
-
- Project Name
- Power Project Engineering Consulting Service in Iraq
- Customer
- KNOC
- Project Period
- 2009.07~2013.05
- Task
- Technology Advice for Business Owner
-
- Project Name
- Engineering Service for Jorf Lasfar Coal Fired Thermal Power Plant in Morocco
- Customer
- Daewoo W&C
- Project Period
- 2010.06~2014.04
- Task
- Design Engineering
-
- Project Name
- Engineering Service for Santa Maria Coal Fired Thermal Power Plant in Chile
- Customer
- POSCO E&C
- Project Period
- 2010.07~2014.02
- Task
- Design Engineering
-
- Project Name
- Engineering Service for S3 CCPP in the UAE
- Customer
- Daewoo E&C
- Project Period
- 2011.03~2014.06
- Task
- Design Engineering
-
- Project Name
- Engineering Technology Service for Tufanbeyli Coal Fired Thermal Power Plant in Turkey
- Customer
- SK E&C
- Project Period
- 2010.11~2015.02
- Task
- Design Engineering
-
- Project Name
- Ghana Takoradi T2 Power Plant Expansion EPC Project
- Customer
- Takoradi Int'I Co.
- Project Period
- 2011.12~2014.12
- Task
- EPC
-
- Project Name
- Installation of a Once - Through Sea Water Cooling System for the Takoradi T1 Power Plant EPC Project
- Customer
- Volta River Authority
- Project Period
- 2013.01~2015.09
- Task
- EPC
-
- Project Name
- CIPREL IV Volet B EPC Project
- Customer
- CIPREL POWER
- Project Period
- 2013.02~2016.03
- Task
- EPC
-
- Project Name
- Design Engineering Services of Libya's Zwitina Add-on Plant
- Customer
- DAEWOO E&C
- Project Period
- 2010.08~2013.08
- Task
- Design Engineering