Bid No | 38 |
---|---|
Item for Bid | Technical Consulting for KHNP SSHAC Project |
Notice Date | 2012-03-28 |
Deadline for Bid Submission | 2012-04-01 |
Content |
<u><font size="2"><strong>Objective of Consulting Services<br />
</strong></font></u><span style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 12pt; mso-bidi-font-size: 10.0pt; mso-fareast-font-family: 바탕체; mso-ansi-language: EN-US; mso-fareast-language: KO; mso-bidi-language: AR-SA; mso-no-proof: yes" lang="EN-US"><font size="2">Defensible, unbiased estimates of DSHA and PSHA of 4 NPP sites in Korea are expected through this consultation. The contractor shall perform the rolls of Project Technical Integrator (PTI) and Participatory Peer Review Panels (PPRPs) and assist KHNP and KEPCO E&C to achieve the objectives of the project.</font> <br /> <br /> <font size="2"><strong><u>Scope of Services<br /> </u></strong><font face="Times New Roman">○</font> Workshop 1 : Orientation workshop for SSHAC process training and development of project plan<br /> <font face="Times New Roman">○ </font>Assemble Panels of International Peer Reviewer<br /> - Retain PPRPs of three internationally recognized xperts with both SSHAC and PSHA experience<br /> <span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore">-<span style="FONT: 7pt 'Times New Roman'"> </span></span></span></font><font size="2"><span lang="EN-US">Take responsibility for make sub-contract agreement with 3 PPRPs<br /> </span><span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore"><span style="FONT: 7pt 'Times New Roman'"> - </span></span></span></font><font size="2"><span lang="EN-US">The PPRPs will attend Workshop 2 & 3 and review the Final SSHAC documentation report and DSHA & PSHA results<br /> </span><span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span></span></font><font size="2"><span lang="EN-US">Contractor will assist the PSHA calculation and provide comments and suggestions for changes and sensitivity results<br /> </span><span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span></span></font><font size="2"><span lang="EN-US"><span lang="EN-US">Contractor </span>will assist the Site Response analysis and provide comments and suggestions for changes and sensitivity results<br /> </span><font face="Times New Roman">○</font> Workshop 2 : <span style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11pt; mso-bidi-font-size: 12.0pt; mso-fareast-font-family: 바탕; mso-ansi-language: EN-US; mso-fareast-language: KO; mso-bidi-language: AR-SA; mso-font-kerning: 1.0pt; mso-bidi-font-weight: bold" lang="EN-US"><span style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 10pt; mso-fareast-font-family: 바탕; mso-ansi-language: EN-US; mso-fareast-language: KO; mso-bidi-language: AR-SA; mso-font-kerning: 1.0pt; mso-bidi-font-weight: bold" lang="EN-US">Significant Issues, Data Needs and Alternative Models<br /> <span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will facilitate Workshop 2<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">SSHAC Training & Elicitation Training<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Review of Project Plan<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Discuss Significant Issues & Data needs<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Discuss Alternative proponent models<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Consulting on elicitation process of DSHA input parameters<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Consulting on analysis of historical & instrumental EQ catalogues<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Consulting on uncertainties of historical & instrumental EQ catalogues and its usage to DSHA<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Provide case studies of DSHA for NPP licensing (i.e. Reg. 1.60)<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Hazard input parameters for both of PSHA & DSHA will be discussed in the Workshop 2<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI and 3 PPRPs will participate in the workshop<br /> </span><font face="Times New Roman">○</font> <span style="COLOR: windowtext; FONT-SIZE: 10pt">Working Meeting: Process of Evaluation and Integration<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will facilitate Working Meetings of TI groups (SSC, GMC, SRC)<br /> </span><span style="FONT-SIZE: 10pt"><span style="FONT: 7pt 'Times New Roman'"> <font size="2">- </font></span></span><span style="FONT-SIZE: 10pt">Evaluate all the data from workshop 2<br /> </span><span style="FONT-SIZE: 10pt"> - Integrate the data into a preliminary seismic source model, ground motion model and site response model<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI will attend one of the working meetings and participate by teleconference call for other working meetings<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will assist to make the Hazard Input Documents (HIDs) for DSHA & PSHA<br /> </span><span style="FONT-SIZE: 10pt"> - Contractor will provide review comments of the Hazard sensitivity analysis<br /> </span><font face="Times New Roman">○</font> <span style="COLOR: windowtext; FONT-SIZE: 10pt">Workshop 3: Model Version 1 Hazard Feedback Workshop<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI will facilitate Workshop 3<br /> - </span><span style="FONT-SIZE: 10pt">Present the SSC, GMC and SRC models<br /> </span><span style="FONT-SIZE: 10pt"> - Present the results of the hazard sensitivity study<br /> </span><span style="FONT-SIZE: 10pt"> - Evaluate the range and appropriateness of uncertainty used for the significant contributors to hazard<br /> </span><span style="FONT-SIZE: 10pt"> - Discuss additional work or studies that can be performed to reduce the uncertainty<br /> </span><span style="FONT-SIZE: 10pt"><span style="FONT: 7pt 'Times New Roman'"> - </span></span><span style="FONT-SIZE: 10pt">Consulting on a preliminary DSHA result<br /> </span><span style="FONT-SIZE: 10pt"> - Consulting and review on the input parameters of DSHA<br /> </span><span style="FONT-SIZE: 10pt"> - Consulting and review on the DSHA process applied<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"><font size="2"> Contractor</font></span></span><span style="FONT-SIZE: 10pt"> will review the final hazard analysis and identification for the significant contributors to hazard<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">Contractor will review the final site response analysis<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI and 3 PPRPs will participate in the workshop<br /> <font face="Times New Roman">○ </font><span style="COLOR: windowtext; FONT-SIZE: 10pt">Working Meeting: Elicitation for final SSC, GMC, SRC models<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will Facilitate Working Meetings of TI groups (SSC, GMC, SRC)<br /> </span><span style="FONT-SIZE: 10pt"><span style="FONT: 7pt 'Times New Roman'"><font size="2"> - </font></span></span><span style="FONT-SIZE: 10pt">Evaluate final SSC, GMC, SRC models<br /> </span><span style="FONT-SIZE: 10pt"> </span><span style="FONT-SIZE: 10pt">-<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI and PPRPs will assist to make the Hazard Input Documents (HIDs) for DSHA & PSHA<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI and PPRPs will respond to questions via teleconference call or email<br /> <font face="Times New Roman">○ <span style="COLOR: windowtext; FONT-SIZE: 10pt">Workshop 4: Final SSC and GMC Model and site hazard results<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will Facilitate Workshop 4<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">Present final SSC, GMC, SRC models<br /> </span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Present final DSHA & PSHA sensitivity results<br /> </span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will attend the workshop<br /> <font face="Times New Roman">○ <span style="COLOR: windowtext; FONT-SIZE: 10pt">Peer Review of Draft and Final Report & Recommendations Developement<br /> </span><span style="FONT-SIZE: 10pt"> - K</span><span style="FONT-SIZE: 10pt">EPCO E&C will prepare a report summarizing the SSC, GMC, SRC final models, results of the hazard analysis, and recommendations for further work or studies. </span><span style="FONT-SIZE: 10pt">PTI and PPRPs will review the draft report and provide comments for incorporation into the Final Report.<br /> <br /> <font size="2"><strong><u>Method of Performance<br /> </u></strong><font face="Times New Roman">○ <span style="COLOR: windowtext" lang="EN-US">The Contractor shall perform the Services and submit the deliverable documentations(Presentation file, Review Report, Workshop summary report) to KEPCO-E&C within 14 days after the completion of each task.<br /> <font face="Times New Roman">○ </font></span><span style="COLOR: windowtext" lang="EN-US">KEPCO-E&C should provide the Contractor with technical data relating to the consultation.<br /> <font face="Times New Roman">○ <u>The Contractor should have a license for execution and modification of the code of FRISK88M.</u></font><br /> </span></font></font></span></font></span></font></span></span></span></span></font></span> |
Attachments |
-
- Bid No
- 38
- Item for Bid
- Technical Consulting for KHNP SSHAC Project
- Notice Date
- 2012-03-28
- Deadline for Bid Submission
- 2012-04-01
- Content
-
<u><font size="2"><strong>Objective of Consulting Services<br />
</strong></font></u><span style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 12pt; mso-bidi-font-size: 10.0pt; mso-fareast-font-family: 바탕체; mso-ansi-language: EN-US; mso-fareast-language: KO; mso-bidi-language: AR-SA; mso-no-proof: yes" lang="EN-US"><font size="2">Defensible, unbiased estimates of DSHA and PSHA of 4 NPP sites in Korea are expected through this consultation. The contractor shall perform the rolls of Project Technical Integrator (PTI) and Participatory Peer Review Panels (PPRPs) and assist KHNP and KEPCO E&C to achieve the objectives of the project.</font> <br />
<br />
<font size="2"><strong><u>Scope of Services<br />
</u></strong><font face="Times New Roman">○</font> Workshop 1 : Orientation workshop for SSHAC process training and development of project plan<br />
<font face="Times New Roman">○ </font>Assemble Panels of International Peer Reviewer<br />
- Retain PPRPs of three internationally recognized xperts with both SSHAC and PSHA experience<br />
<span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore">-<span style="FONT: 7pt 'Times New Roman'"> </span></span></span></font><font size="2"><span lang="EN-US">Take responsibility for make sub-contract agreement with 3 PPRPs<br />
</span><span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore"><span style="FONT: 7pt 'Times New Roman'"> - </span></span></span></font><font size="2"><span lang="EN-US">The PPRPs will attend Workshop 2 & 3 and review the Final SSHAC documentation report and DSHA & PSHA results<br />
</span><span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span></span></font><font size="2"><span lang="EN-US">Contractor will assist the PSHA calculation and provide comments and suggestions for changes and sensitivity results<br />
</span><span style="mso-fareast-font-family: 'Times New Roman'" lang="EN-US"><span style="mso-list: Ignore"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span></span></font><font size="2"><span lang="EN-US"><span lang="EN-US">Contractor </span>will assist the Site Response analysis and provide comments and suggestions for changes and sensitivity results<br />
</span><font face="Times New Roman">○</font> Workshop 2 : <span style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 11pt; mso-bidi-font-size: 12.0pt; mso-fareast-font-family: 바탕; mso-ansi-language: EN-US; mso-fareast-language: KO; mso-bidi-language: AR-SA; mso-font-kerning: 1.0pt; mso-bidi-font-weight: bold" lang="EN-US"><span style="FONT-FAMILY: 'Times New Roman','serif'; FONT-SIZE: 10pt; mso-fareast-font-family: 바탕; mso-ansi-language: EN-US; mso-fareast-language: KO; mso-bidi-language: AR-SA; mso-font-kerning: 1.0pt; mso-bidi-font-weight: bold" lang="EN-US">Significant Issues, Data Needs and Alternative Models<br />
<span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will facilitate Workshop 2<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">SSHAC Training & Elicitation Training<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Review of Project Plan<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Discuss Significant Issues & Data needs<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Discuss Alternative proponent models<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Consulting on elicitation process of DSHA input parameters<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Consulting on analysis of historical & instrumental EQ catalogues<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Consulting on uncertainties of historical & instrumental EQ catalogues and its usage to DSHA<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Provide case studies of DSHA for NPP licensing (i.e. Reg. 1.60)<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Hazard input parameters for both of PSHA & DSHA will be discussed in the Workshop 2<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI and 3 PPRPs will participate in the workshop<br />
</span><font face="Times New Roman">○</font> <span style="COLOR: windowtext; FONT-SIZE: 10pt">Working Meeting: Process of Evaluation and Integration<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will facilitate Working Meetings of TI groups (SSC, GMC, SRC)<br />
</span><span style="FONT-SIZE: 10pt"><span style="FONT: 7pt 'Times New Roman'"> <font size="2">- </font></span></span><span style="FONT-SIZE: 10pt">Evaluate all the data from workshop 2<br />
</span><span style="FONT-SIZE: 10pt"> - Integrate the data into a preliminary seismic source model, ground motion model and site response model<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI will attend one of the working meetings and participate by teleconference call for other working meetings<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will assist to make the Hazard Input Documents (HIDs) for DSHA & PSHA<br />
</span><span style="FONT-SIZE: 10pt"> - Contractor will provide review comments of the Hazard sensitivity analysis<br />
</span><font face="Times New Roman">○</font> <span style="COLOR: windowtext; FONT-SIZE: 10pt">Workshop 3: Model Version 1 Hazard Feedback Workshop<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI will facilitate Workshop 3<br />
- </span><span style="FONT-SIZE: 10pt">Present the SSC, GMC and SRC models<br />
</span><span style="FONT-SIZE: 10pt"> - Present the results of the hazard sensitivity study<br />
</span><span style="FONT-SIZE: 10pt"> - Evaluate the range and appropriateness of uncertainty used for the significant contributors to hazard<br />
</span><span style="FONT-SIZE: 10pt"> - Discuss additional work or studies that can be performed to reduce the uncertainty<br />
</span><span style="FONT-SIZE: 10pt"><span style="FONT: 7pt 'Times New Roman'"> - </span></span><span style="FONT-SIZE: 10pt">Consulting on a preliminary DSHA result<br />
</span><span style="FONT-SIZE: 10pt"> - Consulting and review on the input parameters of DSHA<br />
</span><span style="FONT-SIZE: 10pt"> - Consulting and review on the DSHA process applied<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"><font size="2"> Contractor</font></span></span><span style="FONT-SIZE: 10pt"> will review the final hazard analysis and identification for the significant contributors to hazard<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">Contractor will review the final site response analysis<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI and 3 PPRPs will participate in the workshop<br />
<font face="Times New Roman">○ </font><span style="COLOR: windowtext; FONT-SIZE: 10pt">Working Meeting: Elicitation for final SSC, GMC, SRC models<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will Facilitate Working Meetings of TI groups (SSC, GMC, SRC)<br />
</span><span style="FONT-SIZE: 10pt"><span style="FONT: 7pt 'Times New Roman'"><font size="2"> - </font></span></span><span style="FONT-SIZE: 10pt">Evaluate final SSC, GMC, SRC models<br />
</span><span style="FONT-SIZE: 10pt"> </span><span style="FONT-SIZE: 10pt">-<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI and PPRPs will assist to make the Hazard Input Documents (HIDs) for DSHA & PSHA<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">PTI and PPRPs will respond to questions via teleconference call or email<br />
<font face="Times New Roman">○ <span style="COLOR: windowtext; FONT-SIZE: 10pt">Workshop 4: Final SSC and GMC Model and site hazard results<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will Facilitate Workshop 4<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">Present final SSC, GMC, SRC models<br />
</span><span style="FONT-SIZE: 10pt"> - </span><span style="FONT-SIZE: 10pt">Present final DSHA & PSHA sensitivity results<br />
</span><span style="FONT-SIZE: 10pt"> -<span style="FONT: 7pt 'Times New Roman'"> </span></span><span style="FONT-SIZE: 10pt">PTI will attend the workshop<br />
<font face="Times New Roman">○ <span style="COLOR: windowtext; FONT-SIZE: 10pt">Peer Review of Draft and Final Report & Recommendations Developement<br />
</span><span style="FONT-SIZE: 10pt"> - K</span><span style="FONT-SIZE: 10pt">EPCO E&C will prepare a report summarizing the SSC, GMC, SRC final models, results of the hazard analysis, and recommendations for further work or studies. </span><span style="FONT-SIZE: 10pt">PTI and PPRPs will review the draft report and provide comments for incorporation into the Final Report.<br />
<br />
<font size="2"><strong><u>Method of Performance<br />
</u></strong><font face="Times New Roman">○ <span style="COLOR: windowtext" lang="EN-US">The Contractor shall perform the Services and submit the deliverable documentations(Presentation file, Review Report, Workshop summary report) to KEPCO-E&C within 14 days after the completion of each task.<br />
<font face="Times New Roman">○ </font></span><span style="COLOR: windowtext" lang="EN-US">KEPCO-E&C should provide the Contractor with technical data relating to the consultation.<br />
<font face="Times New Roman">○ <u>The Contractor should have a license for execution and modification of the code of FRISK88M.</u></font><br />
</span></font></font></span></font></span></font></span></span></span></span></font></span>
- Attachments
Prev List | Technical consultation for Diversity Design of EU-APR1400 Electrical System |
---|---|
Next List | Technical Consulting for Data-centric Project Management Guideline using BIM |