EPCM Projects
Project Name | Customer | Project Period |
---|---|---|
EPC Project for KEPAR of Yeongdong Units 1 & 2 |
KEPCO |
1994.11 ~ 1998.12 |
EPC Project for KEPAR of Seocheon Units 1 & 2 |
KEPCO |
1996.11 ~ 1998.12 |
Diesel Fuel Unloading Terminal Construction for Ilijan CCPP in the Philippines |
KEPCO Ilijan Corporation |
1999.10 ~ 2000.10 |
Construction of 500kV Substation at Ilijan, the Philippines |
Washington Group International |
2000.02 ~ 2001.06 |
ESCO Project to Install Coolant for the Heat Exchanger and NG Heater of Bundang CHP |
KOEN |
2001.05 ~ 2006.04 |
Construction to Install Sequential Load Circuit Breaker for the Generator at Hwangsan Plant of Namhae Chemical Corp. |
Namhae Chemical Corp. |
2001.06 ~ 2001.12 |
Engineering and Supply of Control and Protection Equipment for the Sawamlah/Al-Leith Substation in Saudi Arabia |
Arabian BEMCO |
2002.09 ~ 2008.04 |
EPC Project for KEPAR of Pyeongtaek Unit 1 |
KOWEPO |
2002.12 ~ 2005.11 |
Control Equipment Engineering and Supply of Materials and Equipment to the Safa Substation in Saudi Arabia |
Arabian BEMCO |
2003.09 ~ 2008.04 |
Suyeong Office Food Waste and Sewage Co-treatment Plant Renovation Work |
Busan Environmental Corporation |
2003.10 ~ 2004.04 |
ESCO Project to Install Heat Exchanger for Exhaust Gas Waste Heat Recovery of Ilsan CHP Units 1–6 |
EWP |
2009.05 ~ 2010.12 |
Switchyard Engineering of the Site and Supply of Materials and Equipment for Aramco CHP in Saudi Arabia |
Arabian BEMCO |
2004.02 ~ 2009.01 |
Construction for the Sudokwon Landfill Site Land Fill Gas Resource Project |
ECO Energy |
2004.03 ~ 2006.12 |
EPC Project for KEPAR of Namjeju Units 3 & 4 |
KOSPO |
2005.05 ~ 2006.09 |
EPC Project for KEPAR of Boryeong Units 1 & 2 |
KOMIPO |
2005.12 ~ 2010.02 |
ESCO Project to Improve Performance for POSCO CCPP Units 3 & 4 |
POSCO Power |
2006.09 ~ 2009.06 |
ESCO Project to Recover Waste Heat of HRSG for Bucheon Power Plant |
GS Power |
2007.05–2008.08 |
ESCO Project to Install Heat Exchanger for Energy Recovery at Ulsan 2nd CCPP |
EWP |
2008.03 ~ 2009.04 |
ESCO Project to Remodel Fuel Supply Equipment of Yeongdong TPP Unit 1 |
KOEN |
2009.04 ~ 2009.11 |
ESCO Project on the 2nd Step of Chimney Heat Recovery at the Bundang CHP |
KOEN |
2009.04 ~ 2009.12 |
ESCO Project to Install Additional Tubes of the Boiler Economizer in Yeongdong Units 1 & 2 |
KOEN |
2010.09 ~ Present |
EPC Project for Emergency Restoration Work of Shinincheon Steam Turbine Unit 9 |
KOSPO |
2010.12 ~ 2011.03 |
ESCO Project to Install Absorption Type Heat Pump at the Ilsan CHP 1st Power Plant |
EWP |
2011.03 ~ Present |
Extension Work (EPC) for Takoradi T2 Power Plant in Ghana |
TICO(Takoradi International Company) |
2011.12 ~ 2014.12 |
Osan Combined Heat Power Plant EPC Project |
DS Power |
2012.12 ~ 2016.03 |
Installation Construction (EPC) of Sea Water Intake and Discharge Facility for Takoradi T1 Power Plant in Ghana |
Volta River Authority |
2013.01 ~ 2015.09 |
CIPREL IV Volet B PROJECT(EPC) |
CIPREL(Compagnie Ivoirienne de |
2013.02 ~ 2016.03 |
POSCO Energy Incheon CCPP #5,6 RAC upgrade ESCO Project |
POSCO Energy |
2013.02 ~ 2016.03 |
Construction of Top Osan Combined Heat & Power Plant |
DS Power(SPC) |
2012.12 ~ 2016.03 |
-
- Project Name
- EPC Project for KEPAR of Yeongdong Units 1 & 2
- Customer
- KEPCO
- Project Period
- 1994.11 ~ 1998.12
-
- Project Name
- EPC Project for KEPAR of Seocheon Units 1 & 2
- Customer
- KEPCO
- Project Period
- 1996.11 ~ 1998.12
-
- Project Name
- Diesel Fuel Unloading Terminal Construction for Ilijan CCPP in the Philippines
- Customer
- KEPCO Ilijan Corporation
- Project Period
- 1999.10 ~ 2000.10
-
- Project Name
- Construction of 500kV Substation at Ilijan, the Philippines
- Customer
- Washington Group International
- Project Period
- 2000.02 ~ 2001.06
-
- Project Name
- ESCO Project to Install Coolant for the Heat Exchanger and NG Heater of Bundang CHP
- Customer
- KOEN
- Project Period
- 2001.05 ~ 2006.04
-
- Project Name
- Construction to Install Sequential Load Circuit Breaker for the Generator at Hwangsan Plant of Namhae Chemical Corp.
- Customer
- Namhae Chemical Corp.
- Project Period
- 2001.06 ~ 2001.12
-
- Project Name
- Engineering and Supply of Control and Protection Equipment for the Sawamlah/Al-Leith Substation in Saudi Arabia
- Customer
- Arabian BEMCO
- Project Period
- 2002.09 ~ 2008.04
-
- Project Name
- EPC Project for KEPAR of Pyeongtaek Unit 1
- Customer
- KOWEPO
- Project Period
- 2002.12 ~ 2005.11
-
- Project Name
- Control Equipment Engineering and Supply of Materials and Equipment to the Safa Substation in Saudi Arabia
- Customer
- Arabian BEMCO
- Project Period
- 2003.09 ~ 2008.04
-
- Project Name
- Suyeong Office Food Waste and Sewage Co-treatment Plant Renovation Work
- Customer
- Busan Environmental Corporation
- Project Period
- 2003.10 ~ 2004.04
-
- Project Name
- ESCO Project to Install Heat Exchanger for Exhaust Gas Waste Heat Recovery of Ilsan CHP Units 1–6
- Customer
- EWP
- Project Period
- 2009.05 ~ 2010.12
-
- Project Name
- Switchyard Engineering of the Site and Supply of Materials and Equipment for Aramco CHP in Saudi Arabia
- Customer
- Arabian BEMCO
- Project Period
- 2004.02 ~ 2009.01
-
- Project Name
- Construction for the Sudokwon Landfill Site Land Fill Gas Resource Project
- Customer
- ECO Energy
- Project Period
- 2004.03 ~ 2006.12
-
- Project Name
- EPC Project for KEPAR of Namjeju Units 3 & 4
- Customer
- KOSPO
- Project Period
- 2005.05 ~ 2006.09
-
- Project Name
- EPC Project for KEPAR of Boryeong Units 1 & 2
- Customer
- KOMIPO
- Project Period
- 2005.12 ~ 2010.02
-
- Project Name
- ESCO Project to Improve Performance for POSCO CCPP Units 3 & 4
- Customer
- POSCO Power
- Project Period
- 2006.09 ~ 2009.06
-
- Project Name
- ESCO Project to Recover Waste Heat of HRSG for Bucheon Power Plant
- Customer
- GS Power
- Project Period
- 2007.05–2008.08
-
- Project Name
- ESCO Project to Install Heat Exchanger for Energy Recovery at Ulsan 2nd CCPP
- Customer
- EWP
- Project Period
- 2008.03 ~ 2009.04
-
- Project Name
- ESCO Project to Remodel Fuel Supply Equipment of Yeongdong TPP Unit 1
- Customer
- KOEN
- Project Period
- 2009.04 ~ 2009.11
-
- Project Name
- ESCO Project on the 2nd Step of Chimney Heat Recovery at the Bundang CHP
- Customer
- KOEN
- Project Period
- 2009.04 ~ 2009.12
-
- Project Name
- ESCO Project to Install Additional Tubes of the Boiler Economizer in Yeongdong Units 1 & 2
- Customer
- KOEN
- Project Period
- 2010.09 ~ Present
-
- Project Name
- EPC Project for Emergency Restoration Work of Shinincheon Steam Turbine Unit 9
- Customer
- KOSPO
- Project Period
- 2010.12 ~ 2011.03
-
- Project Name
- ESCO Project to Install Absorption Type Heat Pump at the Ilsan CHP 1st Power Plant
- Customer
- EWP
- Project Period
- 2011.03 ~ Present
-
- Project Name
- Extension Work (EPC) for Takoradi T2 Power Plant in Ghana
- Customer
- TICO(Takoradi International Company)
- Project Period
- 2011.12 ~ 2014.12
-
- Project Name
- EPC Project for Top Osan Combined Heat Power Plant
- DS Power
- DS Power
- Project Period
- 2012.12 ~ 2016.03
-
- Project Name
- Installation Construction (EPC) of Sea Water Intake and Discharge Facility for Takoradi T1 Power Plant in Ghana
- Customer
- Volta River Authority
- Project Period
- 2013.01 ~ 2015.09
-
- Project Name
- CIPREL IV Volet B PROJECT(EPC)
- Customer
- CIPREL(Compagnie Ivoirienne de Production dElectricite)
- Project Period
- 2013.02 ~ 2016.03
-
- Project Name
- POSCO energy Incheon CCPP #5,6 RAC upgrade ESCO Project
- Customer
- POSCO Energy
- Project Period
- 2013.02 ~ 2016.09