Business/R&D

Technology for Earth, Energy for Human

Nuclear Power

APR1400

Engineering Status of APR1400
Power Plant Location Capacity(MW) Engineering Construction Period
(First Concrete Placement –
Commercial Operation)
Note

Shin-Kori Unit 3

Uljin-gun, Gyeongsangbuk-do

1,400

KEPCO E&C

2008.10 ~ 2016.12

In Operation

Shin-Kori Unit 4

Uljin-gun, Gyeongsangbuk-do

1,400

KEPCO E&C

2009.10 ~ 2019.09

Under Construction

Shin-Kori Unit 5

Ulju-gun, Ulsan-si

1,400

KEPCO E&C

2017.04 –2023.03

Under Construction

Shin-Kori Unit 6

Ulju-gun, Ulsan-si

1,400

KEPCO E&C

2018.10 –2024.06

Under Construction

Shin-Hanul Unit 1

Shin-Hanul Unit 1

1,400

KEPCO E&C

2012.08 ~ 2019.11

Under Construction

Shin-Hanul Unit 2

Uljin-gun, Gyeongsangbuk-do

1,400

KEPCO E&C

2013.08 ~ 2020.09

Under Construction

BNPP Unit 1

Al Barakha, the UAE

1,400

KEPCO E&C

2012.07 ~ 2018.12

Under Construction

BNPP Unit 2

Al Barakha, the UAE

1,400

KEPCO E&C

2013.04 ~ 2019.08

Under Construction

BNPP Unit 3

Al Barakha, the UAE

1,400

KEPCO E&C

2014.09 ~ 2020.04

Under Construction

BNPP Unit 4

Al Barakha, the UAE

1,400

KEPCO E&C

2015.07 ~ 2020.12

Under Construction

  • Power Plant
    Shin-Kori Unit 3
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2008.10 ~ 2016.12
    Note
    Under Construction
  • Power Plant
    Shin-Kori Unit 4
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2009.10 ~ 2019.09
    Note
    Under Construction
  • Power Plant
    Shin-Kori Unit 5
    Location
    Ulju-gun, Ulsan-si
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2017.04 –2023.03
    Note
    Under Construction
  • Power Plant
    Shin-Kori Unit 6
    Location
    Ulju-gun, Ulsan-si
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2018.10 –2024.06
    Note
    Under Construction
  • Power Plant
    Shin-Hanul Unit 1
    Location
    Shin-Hanul Unit 1
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2012.08 ~ 2019.11
    Note
    Under Construction
  • Power Plant
    Shin-Hanul Unit 2
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2013.08 ~ 2020.09
    Note
    Under Construction
  • Power Plant
    BNPP Unit 1
    Location
    Al Barakah, the UAE
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2012.07 ~ 2018.12
    Note
    Under Construction
  • Power Plant
    BNPP Unit 2
    Location
    Al Barakah, the UAE
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2013.04 ~ 2019.08
    Note
    Under Construction
  • Power Plant
    BNPP Unit 3
    Location
    Al Barakah, the UAE
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2014.09 ~ 2020.04
    Note
    Under Construction
  • Power Plant
    BNPP Unit 4
    Location
    Al Barakah, the UAE
    Capacity(MW)
    1,400
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2015.07 ~ 2020.12
    Note
    Under Construction

OPR1000

Engineering Status of OPR1000
Power Plant Location Capacity (MW) Engineering Construction Period
(First Concrete Placement –
Commercial Operation)
Note

Hanbit Unit 3

Yeonggwan-gun, Jeollanam-do

1,000

KEPCO E&C/WEC

1989.12 ~ 1995.03

In Operation

Hanbit Unit 4

Yeonggwan-gun, Jeollanam-do

1,000

KEPCO E&C/WEC

1990.06 ~ 1996.01

In Operation

Hanul Unit 3

Uljin-gun, Gyeongsangbuk-do

1,000

KEPCO E&C

1993.07 ~ 1998.08

In Operation

Hanul Unit 4

Uljin-gun, Gyeongsangbuk-do

1,000

KEPCO E&C

1993.11 ~ 1999.12

In Operation

Hanbit Unit 5

Yeonggwan-gun, Jeollanam-do

1,000

KEPCO E&C

1997.06 ~ 2002.05

In Operation

Hanbit Unit 6

Yeonggwan-gun, Jeollanam-do

1,000

KEPCO E&C

1997.11 ~ 2002.12

In Operation

Hanul Unit 5

Uljin-gun, Gyeongsangbuk-do

1,000

KEPCO E&C

1999.10 ~ 2004.07

In Operation

Hanul Unit 6

Uljin-gun, Gyeongsangbuk-do

1,000

KEPCO E&C

2000.10 ~ 2005.04

In Operation

Shin-Kori Unit 1

Gijang-gun, Busan

1,000

KEPCO E&C

2006.06 ~ 2011.02

In Operation

Shin-Kori Unit 2

Gijang-gun, Busan

1,000

KEPCO E&C

2007.06 ~ 2011.12

In Operation

Shin-Wolsong Unit 1

Gyeongju-si, Gyeongsangbuk-do

1,000

KEPCO E&C

2007.12 ~ 2012.03

In Operation

Shin-Wolsong Unit 2

Gyeongju-si, Gyeongsangbuk-do

1,000

KEPCO E&C

2008.12 ~ 2013.08

In Operation

  • Power Plant
    Hanbit Unit 3
    Location
    Yeonggwan-gun, Jeollanam-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C/WEC
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1989.12 ~ 1995.03
    Note
    In Operation
  • Power Plant
    Hanbit Unit 4
    Location
    Yeonggwan-gun, Jeollanam-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C/WEC
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1990.06 ~ 1996.01
    Note
    In Operation
  • Power Plant
    Hanul Unit 3
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1993.07 ~ 1998.08
    Note
    In Operation
  • Power Plant
    Hanul Unit 4
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1993.11 ~ 1999.12
    Note
    In Operation
  • Power Plant
    Hanbit Unit 5
    Location
    Yeonggwan-gun, Jeollanam-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1997.06 ~ 2002.05
    Note
    In Operation
  • Power Plant
    Hanbit Unit 6
    Location
    Yeonggwan-gun, Jeollanam-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1997.11 ~ 2002.12
    Note
    In Operation
  • Power Plant
    Hanul Unit 5
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1999.10 ~ 2004.07
    Note
    In Operation
  • Power Plant
    Hanul Unit 6
    Location
    Uljin-gun, Gyeongsangbuk-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2000.10 ~ 2005.04
    Note
    In Operation
  • Power Plant
    Shin-Kori Unit 1
    Location
    Gijang-gun, Busan
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2006.06 ~ 2011.02
    Note
    In Operation
  • Power Plant
    Shin-Kori Unit 2
    Location
    Gijang-gun, Busan
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2007.06 ~ 2011.12
    Note
    In Operation
  • Power Plant
    Shin-Wolsong Unit 1
    Location
    Gyeongju-si, Gyeongsangbuk-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2007.12 ~ 2012.03
    Note
    In Operation
  • Power Plant
    Shin-Wolsong Unit 2
    Location
    Gyeongju-si, Gyeongsangbuk-do
    Capacity(MW)
    1,000
    Engineering
    KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    2008.12 ~ 2013.08
    Note
    In Operation

CANDU Nuclear Power Plants

Engineering Status of CANDU Nuclear Power Plants
Power Plant Location Capacity (MW) Engineering Construction Period
(First Concrete Placement –
Commercial Operation)
Note

Wolsong Unit 2

Gyeongju-si, Gyeongsangbuk-do

713

AECL/KEPCO E&C

1992.09 ~ 1997.07

In Operation

Wolsong Unit 3

Gyeongju-si, Gyeongsangbuk-do

715

KEPCO E&C/AECL

1994.04 ~ 1998.07

In Operation

Wolsong Unit 4

Gyeongju-si, Gyeongsangbuk-do

715

KEPCO E&C/AECL

1994.08 ~ 1999.10

In Operation

  • Power Plant
    Wolsong Unit 2
    Location
    Gyeongju-si, Gyeongsangbuk-do
    Capacity(MW)
    713
    Engineering
    AECL/KEPCO E&C
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1992.09 ~ 1997.07
    Note
    In Operation
  • Power Plant
    Wolsong Unit 3
    Location
    Gyeongju-si, Gyeongsangbuk-do
    Capacity(MW)
    715
    Engineering
    KEPCO E&C/AECL
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1994.04 ~ 1998.07
    Note
    In Operation
  • Power Plant
    Wolsong Unit 4
    Location
    Gyeongju-si, Gyeongsangbuk-do
    Capacity(MW)
    715
    Engineering
    KEPCO E&C/AECL
    Construction Period(First Concrete Placement –
    Commercial Operation)
    1994.08 ~ 1999.10
    Note
    In Operation