Building a Foundation for Power Plant Engineering Industry
- 1986
- 10 Awarded Contract for Technological Consulting to Establish Ways to Reduce Power Loss in Bangladesh
- 06 Awarded Contract for Engineering Service of Boryeong Thermal Power Plant Units 3 & 4 (1st Stage)
- 03 Awarded Contract for the Technological Service of Performance Recovery Construction for Malaya Thermal Power Plant Units 1 & 2 in the Philippines
- 01 Awarded Engineering Service Contract for Multi-Purpose Research Reactor (MRR)
- 1985
- 10 Held Power Technology Seminar, and Arts and Photograph Exhibition : and Published 10 Years of History of Company to Commemorate the 10th Anniversary of Foundation
- 08 Awarded Contract for the Investigation of Standardization of Nuclear Power Plant
- 02 Awarded Contract for Technological Service in Construction of Combined Heat & Power Plant in Banwol Industrial Complex
- 01 Established a Company Song (Lyrics: Jeong Geun-mo, Music: Jang Il-nam)
- 1984
- 09 Awarded Contract for the Development of Standard Coal-Fired Thermal Power Plant
- 09 Introduced Intergraph CAD System (VAXII/751), a Large Scale Computer
- 06 Awarded Contract for the Development Service of the First Computer System of the Company (Computerization of Operation and Management of Nuclear Power Plants)
- 06 Obtained ASME N-Certification
- 1983
- 09 Opened CEP Master’s Curriculum
- 07 Introduced Matrix Organization Operating System
- 03 Awarded Contract for R&D on Standardization of Nuclear Power Plant
- 03 Introduced PCs to be Used for Work for the First Time
- 1982
- 12 Established the Power Technology Self-Reliance Method
- 11 Established KOPEC R&D Center
- 10 Awarded A/E Contract as the Main Contractor of Hanbit Nuclear Power Plant Units 3 & 4
- 07 Reorganized the Company Name to ‘Korea Power Engineering Company, Inc(KOPEC)’
- 1981
- 12 Achieved the First Operation in Black Since the Foundation
- 10 Awarded Engineering Service Contract for the Honam-Yeosu Thermal Power Plant Fuel Conversion Construction
- 10 Published the First Issue of the Company Newsletter ‘Power Engineering’
- 03 Signed Contract with Framatom of France for the Participation in Engineering Service of Hanul Nuclear Power Plant Units 1 & 2
- 1980
- 11 Awarded Contract for Plant Inspection and Field Inspection of Nuclear Power Localization Parts
- 08 Awarded Contract for Field Engineering of Kori Nuclear Power Plant Units 3 & 4
- 07 Signed Contract with Sogreah of France for the Feasibility Study Service of Garorim Tidal Power Station
- 06 Awarded Contract for the Construction and Supervision of Test Operation of Seohae Thermal Power Plant Units 1 & 2
- 1979
- 12 Introduced Time Card (Daily Task Report)
- 11 Signed Contract with AECL of Canada for the Manpower Support on Site Engineering of Wolsong Nuclear Power Plant Unit 1
- 09 Awarded Contract for the Site Environment Survey Service on Hanul Nuclear Power Plant Units 1 & 2
- 06 Dispatched 42 Employees to Belgatom of Belgium for the Training of Nuclear Power Plant Engineering Technology (–1980.6.16)
- 1978
- 11 Exchanged MOU on Technological Alliance with Frammateg/Sofinel of France
- 09 Awarded Contract for the Technological Service on Review of Engineering and Construction Method for Kori Unit 2
- 09 Signed Contract for Overseas Training and Practical Participation of Kori Nuclear Power Plant Units 3 & 4 with Bechtel of the USA
- 05 Selected as the Nuclear Power Technology Receiving Company Related to Kori Nuclear Power Plant Units 3 & 4
- 1977
- 09 Signed Pre-project Engineering Service Contract with Bechtel of the USA on Kori Nuclear Power Plant Units 3 & 4
- 07 Awarded Contract for Preliminary Safety Analysis Report (PSAR) on Kori Nuclear Power Plant Unit 2
- 06 Exchanged MOU on Technological Alliance with Burns & Roe of the USA(First Introduction of Overseas Technology)
- 04 Formed Decision That KNE Would Be the Single Company for A/E on Nuclear Power Plants at the Vice Ministers’ Meeting of the Economic Ministries
- 1976
- 11 Formed Decision to Promote KNE to be the Single Company for Localization of A/E for Nuclear Power Plants by the President
- 10 Awarded Comprehensive Assessment Contract fot the Construction of Nuclear Power Plants
- 06 Reorganized as Korea Nuclear Engineering Co. (KNE)
- 01 Received 10 New Employees
- 1975
- 10 Founded Korea Atomic Burns & Roe, Inc.(KABAR)
- 10 Registration of Incorporation with Paid-in Capital of KRW 50 million
- 09 Held Meeting of Promoters for Foundation
- 02 Decided the Joint Company as Burns & Roe of USA