Flue Gas Desulfurization System
Project Name | Customer | Capacity(MW) | Project Period | Desulfurization Type |
---|---|---|---|---|
FGD System Engineering Service for Boryeong Units 3–6 |
KEPCO |
500×4 |
1985.06 ~ 1999.07 |
Packed Tower |
FGD System Engineering Service for Taean Units 1–6 |
KEPCO |
500×6 |
1987.12 ~ 2002.09 |
Open Spray/Tray |
FGD System Engineering Service for Hadong Units 1–6 |
KEPCO |
500×6 |
1989.11 ~ 2001.09 |
Open Spray/Tray |
FGD System Engineering Service for Dangjin Units 1–4 |
KEPCO |
500×4 |
1989.11 ~ 2001.06 |
Open Spray |
FGD System Engineering Service for Donghae Units 1–2 |
KEPCO |
200×2 |
1993.02 ~ 1998.09 |
Dry Injection |
FGD System Engineering Service for Yeongheung Units 1–2 |
KEPCO |
800×2 |
1994.09 ~ 2004.12 |
Open Spray |
FGD System Turnkey Project for Youngdong Units 1–2 |
KEPCO |
125+200 |
1994.11 ~ 1998.12 |
KEPAR |
FGD System Turnkey Project for Seocheon Units 1–2 |
KEPCO |
200×2 |
1996.11 ~ 1998.12 |
KEPAR |
FGD System Engineering Service for Dangjin Units 5–8 |
EWP |
500×4 |
2000.11 ~ 2008.03 |
DCFS |
FGD System Engineering Service for Samcheonpo Units 1–4 |
KOEN |
560×4 |
2001.05 ~ 2007.03 |
Open Spray |
FGD System Engineering Service for Taean Units 7–8 |
KOWEPO |
500×2 |
2002.08 ~ 2008.06 |
Open Spray |
FGD System Engineering Service for Boryeong Units 7–8 |
KOMIPO |
500×2 |
2002.09 ~ 2009.03 |
Open Spray |
FGD System Turnkey Project for Pyeongtaek Unit 1 |
KOWEPO |
350 |
2002.12 ~ 2005.11 |
KEPAR |
FGD System Engineering Service for Yeongheung Units 3–4 |
KOEN |
870×2 |
2003.02 ~ 2009.06 |
Open Spray |
FGD System Engineering Service for Hadong Units 7–8 |
KOSPO |
500×2 |
2003.09 ~ 2009.06 |
Open Spray |
FGD System Turnkey Project for Namjeju Units 3–4 |
KOSPO |
100×2 |
2005.01 ~ 2007.03 |
KEPAR |
FGD System Turnkey Project for Boryeong Units 1–2 |
KOMIPO |
500×2 |
2005.12 ~ 2010.08 |
KEPAR |
FGD System Engineering Service for Dangjin Units 9–10 |
EWP |
1,000×2 |
2007.10 ~ 2016.12 |
DCFS |
FGD System Engineering Service for Shin-Boryeong Units 1–2 |
KOMIPO |
1,000×2 |
2011.01 ~ 2016.12 |
Later |
FGD System Engineering Service for Taean Units 9–10 |
KOWEPO |
1,000×2 |
2011.05 ~ 2017.12 |
DCFS |
FGD System Engineering Service for Bukpyeong |
GS Donghae Electric Power Co., Ltd. |
595×2 |
2011.03 ~ 2017.12 |
DCFS |
FGD System Engineering Service for POSPower |
POSPower |
1,050×2 |
2013.06 ~ Present |
Later |
FGD System Engineering Service for Gangneung Anin Units 1–2 |
Samsung C&T |
1,040×2 |
2014.02 ~ Present |
Open Spray |
Engineering Service for Shin-seocheon Thermal FGD System |
KOMIPO |
1,018×1 |
2014.06 ~ Present |
Later |
FGD System Engineering Service for Goseong Green Power Units 1–2 |
SK E&C |
1,040×2 |
2014.10 ~ Present |
Later |
-
- Project Name
- FGD System Engineering Service for Boryeong Units 3–6
- Customer
- KEPCO
- Capacity(MW)
- 500×4
- Project Period
- 1985.06 ~ 1999.07
- Desulfurization Type
- Packed Tower
-
- Project Name
- FGD System Engineering Service for Taean Units 1–6
- Customer
- KEPCO
- Capacity(MW)
- 500×6
- Project Period
- 1987.12 ~ 2002.09
- Desulfurization Type
- Open Spray/Tray
-
- Project Name
- FGD System Engineering Service for Hadong Units 1–6
- Customer
- KEPCO
- Capacity(MW)
- 500×6
- Project Period
- 1989.11 ~ 2001.09
- Desulfurization Type
- Open Spray/Tray
-
- Project Name
- FGD System Engineering Service for Dangjin Units 1–4
- Customer
- KEPCO
- Capacity(MW)
- 500×4
- Project Period
- 1989.11 ~ 2001.06
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Engineering Service for Donghae Units 1–2
- Customer
- KEPCO
- Capacity(MW)
- 200×2
- Project Period
- 1993.02 ~ 1998.09
- Desulfurization Type
- Dry Injection
-
- Project Name
- FGD System Engineering Service for Yeongheung Units 1–2
- Customer
- KEPCO
- Capacity(MW)
- 800×2
- Project Period
- 1994.09 ~ 2004.12
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Turnkey Project for Youngdong Units 1–2
- Customer
- KEPCO
- Capacity(MW)
- 125+200
- Project Period
- 1994.11 ~ 1998.12
- Desulfurization Type
- KEPAR
-
- Project Name
- FGD System Turnkey Project for Seocheon Units 1–2
- Customer
- KEPCO
- Capacity(MW)
- 200×2
- Project Period
- 1996.11 ~ 1998.12
- Desulfurization Type
- KEPAR
-
- Project Name
- FGD System Engineering Service for Dangjin Units 5–8
- Customer
- EWP
- Capacity(MW)
- 500×4
- Project Period
- 2000.11 ~ 2008.03
- Desulfurization Type
- DCFS
-
- Project Name
- FGD System Engineering Service for Samcheonpo Units 1–4
- Customer
- KOEN
- Capacity(MW)
- 560×4
- Project Period
- 2001.05 ~ 2007.03
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Engineering Service for Taean Units 7–8
- Customer
- KOWEPO
- Capacity(MW)
- 500×2
- Project Period
- 2002.08 ~ 2008.06
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Engineering Service for Boryeong Units 7–8
- Customer
- KOMIPO
- Capacity(MW)
- 500×2
- Project Period
- 2002.09 ~ 2009.03
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Turnkey Project for Pyeongtaek Unit 1
- Customer
- KOWEPO
- Capacity(MW)
- 350
- Project Period
- 2002.12 ~ 2005.11
- Desulfurization Type
- KEPAR
-
- Project Name
- FGD System Engineering Service for Yeongheung Units 3–4
- Customer
- KOEN
- Capacity(MW)
- 870×2
- Project Period
- 2003.02 ~ 2009.06
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Engineering Service for Hadong Units 7–8
- Customer
- KOSPO
- Capacity(MW)
- 500×2
- Project Period
- 2003.09 ~ 2009.06
- Desulfurization Type
- Open Spray
-
- Project Name
- FGD System Turnkey Project for Namjeju Units 3–4
- Customer
- KOSPO
- Capacity(MW)
- 100×2
- Project Period
- 2005.01 ~ 2007.03
- Desulfurization Type
- KEPAR
-
- Project Name
- FGD System Turnkey Project for Boryeong Units 1–2
- Customer
- KOMIPO
- Capacity(MW)
- 500×2
- Project Period
- 2005.12 ~ 2010.08
- Desulfurization Type
- KEPAR
-
- Project Name
- FGD System Engineering Service for Dangjin Units 9–10
- Customer
- EWP
- Capacity(MW)
- 1,000×2
- Project Period
- 2007.10 ~ 2016.12
- Desulfurization Type
- DCFS
-
- Project Name
- FGD System Engineering Service for Shin-Boryeong Units 1–2
- Customer
- KOMIPO
- Capacity(MW)
- 1,000×2
- Project Period
- 2011.01 ~ 2016.12
- Desulfurization Type
- Later
-
- Project Name
- FGD System Engineering Service for Taean Units 9–10
- Customer
- KOWEPO
- Capacity(MW)
- 1,000×2
- Project Period
- 2011.05 ~ 2017.12
- Desulfurization Type
- DCFS
-
- Project Name
- FGD System Engineering Service for Bukpyeong
- Customer
- GS Donghae Electric Power Co., Ltd.
- Capacity(MW)
- 595×2
- Project Period
- 2011.03 ~ 2017.12
- Desulfurization Type
- DCFS
-
- Project Name
- FGD System Engineering Service for POSPower
- Customer
- POSPower
- Capacity(MW)
- 1,050×2
- Project Period
- 2013.06 ~ Present
- Desulfurization Type
- Later
-
- Project Name
- FGD System Engineering Service for Gangneung Anin Units 1–2
- Customer
- Samsung C&T
- Capacity(MW)
- 1,040×2
- Project Period
- 2014.02 ~ Present
- Desulfurization Type
- Open Spray
-
- Project Name
- Engineering Service for Shin-seocheon Thermal FGD System
- Customer
- KOMIPO
- Capacity(MW)
- 1,018×1
- Project Period
- 2014.06 ~ Present
- Desulfurization Type
- Later
-
- Project Name
- FGD System Engineering Service for Goseong Green Power Units 1–2
- Customer
- SK E&C
- Capacity(MW)
- 1,040×2
- Project Period
- 2014.10 ~ Present
- Desulfurization Type
- Later
DeNOx Facilities
Project Name | Customer | Project Period |
---|---|---|
DeNOx System Engineering Service for Yeongheung Units 1 & 2 |
KOEN |
1994.09 ~ 2004.12 |
DeNOx Turnkey Project for Namjeju Units 1–4 |
KEPCO |
1999.02 ~ 2000.05 |
DeNOx System Engineering Service for Seoul Units 4 & 5 |
KOMIPO |
2000.02 ~ 2002.05 |
DeNOx System Engineering Service for Incheon Units 1 & 2 |
KOMIPO |
2000.03 ~ 2002.06 |
DeNOx System Engineering Service for Dangjin Units 5–8 |
EWP |
2000.11 ~ 2008.03 |
DeNOx System Engineering Service for Ulsan Units 4–6 |
EWP |
2001.01 ~ 2003.03 |
DeNOx System Engineering Service for Samcheonpo Units 3 & 4 |
KOEN |
2001.05 ~ 2007.03 |
DeNOx System Engineering Service for Taean Units 7 & 8 |
KOWEPO |
2002.08 ~ 2008.06 |
DeNOx System Engineering Service for Boryeong Units 7 & 8 |
KOMIPO |
2002.09 ~ 2009.03 |
DeNOx System Engineering Service for Yeongheung 3 & 4 |
KOEN |
2003.02 ~ 2009.06 |
DeNOx System Engineering Service for Hadong Units 7 & 8 |
KOSPO |
2003.09 ~ 2009.06 |
DeNOx System Engineering Service for Dangjin Units 1–4 |
EWP |
2003.10 ~ 2007.07 |
DeNOx System Engineering Service for Hadong Units 1–6 |
KOSPO |
2003.12 ~ 2007.09 |
DeNOx System Engineering Service for Incheon Units 3 & 4 |
KOMIPO |
2004.03 ~ 2006.03 |
DeNOx System Engineering Service for Boryeong Units 1 & 2 |
KOMIPO |
2006.07 ~ 2009.07 |
DeNOx System Engineering Service for Honam Units 1 & 2 |
EWP |
2008.08 ~ 2011.03 |
DeNOx System Engineering Service for Samcheonpo Units 1 & 2 |
KOEN |
2008.09 ~ 2009.03 |
DeNOx System Engineering Service for Shin-boryeong Units 1 & 2 |
KOMIPO |
2011.01 ~ Present |
DeNOx System Engineering Service for Taean Units 9 & 10 |
KOWEPO |
2011.05 ~ Present |
DeNOx System Engineering Service for Bukpyeong Units 1 & 2 |
GS Donghae Electric Power Co., Ltd. |
2011.03 ~ Present |
DeNOx System Engineering Service for POSPower |
POSPower |
2013.06 ~ Present |
DeNOx System Engineering Service for Gangneung Anin Units 1 & 2 |
Samsung C&T |
2014.01 ~ Present |
DeNOx System Engineering Service for Shin-Seocheon Unit 1 |
KOMIPO |
2014.06 ~ Present |
DeNOx System Design for Dangjin Units 9 & 10 |
Korea East-West Power |
2007.10 ~ 2017.04 |
DeNOx System Design for Samchok Green Power Units 1 & 2 |
Korea Southern Power |
2009.09 ~ 2018.08 |
DeNOx System Engineering for Goseong HI Units 1 & 2 |
SK E&C |
2014.10 ~ Present |
-
- Project Name
- DeNOx System Engineering Service for Yeongheung Units 1 & 2
- Customer
- KOEN
- Project Period
- 1994.09 ~ 2004.12
-
- Project Name
- DeNOx Turnkey Project for Namjeju Units 1–4
- Customer
- KEPCO
- Project Period
- 1999.02 ~ 2000.05
-
- Project Name
- DeNOx System Engineering Service for Seoul Units 4 & 5
- Customer
- KOMIPO
- Project Period
- 2000.02 ~ 2002.05
-
- Project Name
- DeNOx System Engineering Service for Incheon Units 1 & 2
- Customer
- KOMIPO
- Project Period
- 2000.03 ~ 2002.06
-
- Project Name
- DeNOx System Engineering Service for Dangjin Units 5–8
- Customer
- EWP
- Project Period
- 2000.11 ~ 2008.03
-
- Project Name
- DeNOx System Engineering Service for Ulsan Units 4–6
- Customer
- EWP
- Project Period
- 2001.01 ~ 2003.03
-
- Project Name
- DeNOx System Engineering Service for Samcheonpo Units 3 & 4
- Customer
- KOEN
- Project Period
- 2001.05 ~ 2007.03
-
- Project Name
- DeNOx System Engineering Service for Taean Units 7 & 8
- Customer
- KOWEPO
- Project Period
- 2002.08 ~ 2008.06
-
- Project Name
- DeNOx System Engineering Service for Boryeong Units 7 & 8
- Customer
- KOMIPO
- Project Period
- 2002.09 ~ 2009.03
-
- Project Name
- DeNOx System Engineering Service for Yeongheung 3 & 4
- Customer
- KOEN
- Project Period
- 2003.02 ~ 2009.06
-
- Project Name
- DeNOx System Engineering Service for Hadong Units 7 & 8
- Customer
- KOSPO
- Project Period
- 2003.09 ~ 2009.06
-
- Project Name
- DeNOx System Engineering Service for Dangjin Units 1–4
- Customer
- EWP
- Project Period
- 2003.10 ~ 2007.07
-
- Project Name
- DeNOx System Engineering Service for Hadong Units 1–6
- Customer
- KOSPO
- Project Period
- 2003.12 ~ 2007.09
-
- Project Name
- DeNOx System Engineering Service for Incheon Units 3 & 4
- Customer
- KOMIPO
- Project Period
- 2004.03 ~ 2006.03
-
- Project Name
- DeNOx System Engineering Service for Boryeong Units 1 & 2
- Customer
- KOMIPO
- Project Period
- 2006.07 ~ 2009.07
-
- Project Name
- DeNOx System Engineering Service for Honam Units 1 & 2
- Customer
- EWP
- Project Period
- 2008.08 ~ 2011.03
-
- Project Name
- DeNOx System Engineering Service for Samcheonpo Units 1 & 2
- Customer
- KOEN
- Project Period
- 2008.09 ~ 2009.03
-
- Project Name
- DeNOx System Engineering Service for Shin-boryeong Units 1 & 2
- Customer
- KOMIPO
- Project Period
- 2011.01 ~ Present
-
- Project Name
- DeNOx System Engineering Service for Taean Units 9 & 10
- Customer
- KOWEPO
- Project Period
- 2011.05 ~ Present
-
- Project Name
- DeNOx System Engineering Service for Bukpyeong Units 1 & 2
- Customer
- GS Donghae Electric Power Co., Ltd.
- Project Period
- 2011.03 ~ Present
-
- Project Name
- DeNOx System Engineering Service for POSPower
- Customer
- POSPower
- Project Period
- 2013.06 ~ Present
-
- Project Name
- DeNOx System Engineering Service for Gangneung Anin Units 1 & 2
- Customer
- Samsung C&T
- Project Period
- 2014.01 ~ Present
-
- Project Name
- DeNOx System Engineering Service for Shin-Seocheon Unit 1
- Customer
- KOMIPO
- Project Period
- 2014.06 ~ Present
-
- Project Name
- DeNOx System Design for Dangjin Units 9 & 10
- Customer
- Korea East-West Power
- Project Period
- 2007.10 ~ 2017.04
-
- Project Name
- DeNOx System Design for Samchok Green Power Units 1 & 2
- Customer
- Korea Southern Power
- Project Period
- 2009.09 ~ 2018.08
-
- Project Name
- DeNOx System Engineering for Goseong HI Units 1 & 2
- Customer
- SK E&C
- Project Period
- 2014.10 ~ Present
KoNOx® Projects
Project Name | Customer | Completion Date |
---|---|---|
Low Temperature Denitrification System Turnkey Project for Bundang CCPP Unit 6 |
KOEN |
2003.11 |
Low Temperature Catalyst Supply Project for Gwacheon-si Resource Purification Center |
Gwacheon Resource Recovery Facility |
2003.11 |
Low Temperature Catalyst Supply Project for Samsung Corning Gumi Office |
Samsung Corning Precision Glass |
2003.12 |
Low Temperature Catalyst Supply Project for Samsung Corning Suwon Office |
Samsung Corning Precision Glass |
2003.12 |
Low Temperature Catalyst Supply Project for Hu-Chems |
Hu-Chems |
2004.04 |
Low Temperature Catalyst Supply Project for Kumho P&B Chemicals |
FiberTech |
2004.11 |
Low Temperature Catalyst Supply Project for Bucheon-si Resource Purification Center (Daejang) |
Daewoo E&C |
2005.09 |
Low Temperature Catalyst Supply Project for Bucheon-si Resource Purification Center (Samjeong) |
Daewoo E&C |
2005.09 |
Low Temperature Catalyst Supply Project for Daesung Industrial Co-gen Division |
KC Cottrell |
2005.12 |
KEAHOLE ST-7 SCR & Urea Conversion System Supply Project, USA |
HELCO |
2007.07 |
SCR Catalyst Supply Project for Dongsuh Foods |
Kocat |
2007.10 |
DeNOx Facility Construction for Sithe Power Plant |
SK Hynix |
2009.04 |
SCR Catalyst Supply Project for Dongwoo Fine-Chem |
Dongwoo Fine-Chem |
2009.03 |
Catalyst Supply Project for Yeongheung Power Plant Unit 1 |
Yeongheung Thermal Power |
2009.04 |
SCR Catalyst Supply Project for Pangyo Combined Heat & Power Plant |
Korea District Heating Corp. |
2009.08 |
Manufactured and Supplied Catalyst for DeNOx Facility |
TS Corporation |
2009.09 |
Manufactured and Supplied Catalyst for DeNOx Facility |
Hong Won Paper Mfg Co., Ltd. |
2009.09 |
DeNox Supply Project for Co-op City Power Plant, USA |
Co-op City Power Plant, USA |
2010.02 |
SCR Reactor Catalyst (KoNOx DRC 30) Supply Project |
Kumho P&B Chemicals |
2010.05 |
DeNOx Catalyst Supply Project |
Korea District Heating Corp. (Daegu Branch Office) |
2010.08 |
DeNOx Catalyst Supply Project for Pyeongtaek Thermal Power Plant Unit 2 |
Pyeongtaek Thermal Power |
2010.08 |
Basic Engineering Service for Coal Fired Power Plant Conversion System with over 2 million CMH |
Hanmo Corporation |
2010.09 |
Powder Type Catalyst Supply Project for Ulsan Thermal Power Plant Units 4 & 6 |
Ulsan Thermal Power |
2010.11 |
Suwon SCR Catalyst Performance Diagnosis Service |
Korea District Heating Corp. |
2010.12 |
Powder Type Catalyst Supply Project for Samcheonpo Power Plant Unit 4 |
Samcheonpo Thermal Power |
2011.02 |
Urea Handling System for Saudi's Rabigh VI SCR Supply Project |
Doosan Heavy Industries & Construction |
2012.07 |
DeNOx Catalyst Supply Project for Geoje-si Household Waste Disposal Facility |
Geoje-si |
2012.05 |
Pohang LNG Combined Cycle Power Plant NOx Reduction SCR Supply Project |
Posco ICT |
2012.06 |
Ulsan Thermal Power Plant Units 4 & 5 Hybrid SCR Denitrification System |
Korea East-West Power |
2012.08 |
Saudi Arabia Yanbu 2 Catalyst Supply Project |
Doosan Heavy Industries & Construction |
2014.06 |
-
- Project Name
- Low Temperature Denitrification System Turnkey Project for Bundang CCPP Unit 6
- Customer
- KOEN
- Completion Date
- 2003.11
-
- Project Name
- Low Temperature Catalyst Supply Project for Gwacheon-si Resource Purification Center
- Customer
- Gwacheon Resource Recovery Facility
- Completion Date
- 2003.11
-
- Project Name
- Low Temperature Catalyst Supply Project for Samsung Corning Gumi Office
- Customer
- Samsung Corning Precision Glass
- Completion Date
- 2003.12
-
- Project Name
- Low Temperature Catalyst Supply Project for Samsung Corning Suwon Office
- Customer
- Samsung Corning Precision Glass
- Completion Date
- 2003.12
-
- Project Name
- Low Temperature Catalyst Supply Project for Hu-Chems
- Customer
- Hu-Chems
- Completion Date
- 2004.04
-
- Project Name
- Low Temperature Catalyst Supply Project for Kumho P&B Chemicals
- Customer
- FiberTech Kumho P&B Chem
- Completion Date
- 2004.11
-
- Project Name
- ow Temperature Catalyst Supply Project for Bucheon-si Resource Purification Center (Daejang)
- Customer
- Daewoo E&C City of Bucheon
- Completion Date
- 2005.09
-
- Project Name
- Low Temperature Catalyst Supply Project for Bucheon-si Resource Purification Center (Samjeong)
- Customer
- Daewoo E&C City of Bucheon
- Completion Date
- 2005.09
-
- Project Name
- Low Temperature Catalyst Supply Project for Daesung Industrial Co-gen Division
- Customer
- KC Cottrell Daesung Corp.
- Completion Date
- 2005.12
-
- Project Name
- KEAHOLE ST-7 SCR & Urea Conversion System Supply Project, USA
- Customer
- HELCO
- Completion Date
- 2007.07
-
- Project Name
- SCR Catalyst Supply Project for Dongsuh Foods
- Customer
- Kocat Dongsuh Food Corp.
- Completion Date
- 2007.10
-
- Project Name
- DeNOx Facility Construction for Sithe Power Plant
- Customer
- SK Hynix
- Completion Date
- 2009.04
-
- Project Name
- SCR Catalyst Supply Project for Dongwoo Fine-Chem
- Customer
- Dongwoo Fine-Chem
- Completion Date
- 2009.03
-
- Project Name
- Catalyst Supply Project for Yeongheung Power Plant Unit 1
- Customer
- Yeongheung Thermal Power EWP
- Completion Date
- 2009.04
-
- Project Name
- SCR Catalyst Supply Project for Pangyo Combined Heat & Power Plant
- Customer
- Korea District Heating Corp.
- Completion Date
- 2009.08
-
- Project Name
- Manufactured and Supplied Catalyst for DeNOx Facility
- Customer
- TS Corporation
- Completion Date
- 2009.09
-
- Project Name
- Manufactured and Supplied Catalyst for DeNOx Facility
- Customer
- Hong Won Paper Mfg Co., Ltd.
- Completion Date
- 2009.09
-
- Project Name
- DeNox Supply Project for Co-op City Power Plant, USA
- Customer
- Co-op City Power Plant, USA
- Completion Date
- 2010.02
-
- Project Name
- SCR Reactor Catalyst (KoNOx DRC 30) Supply Project
- Customer
- Kumho P&B Chemicals
- Completion Date
- 2010.05
-
- Project Name
- DeNOx Catalyst Supply Project
- Customer
- Korea District Heating Corp. (Daegu Branch Office)
- Completion Date
- 2010.08
-
- Project Name
- DeNOx Catalyst Supply Project for Pyeongtaek Thermal Power Plant Unit 2
- Customer
- Pyeongtaek Thermal Power KOWEPO
- Completion Date
- 2010.08
-
- Project Name
- Basic Engineering Service for Coal Fired Power Plant Conversion System with over 2 million CMH
- Customer
- Hanmo Corporation
- Completion Date
- 2010.09
-
- Project Name
- Powder Type Catalyst Supply Project for Ulsan Thermal Power Plant Units 4 & 6
- Customer
- Ulsan Thermal Power
- Completion Date
- 2010.11
-
- Project Name
- Suwon SCR Catalyst Performance Diagnosis Service
- Customer
- Korea District Heating Corp.
- Completion Date
- 2010.12
-
- Project Name
- Powder Type Catalyst Supply Project for Samcheonpo Power Plant Unit 4
- Customer
- Samcheonpo Thermal Power
- Completion Date
- 2011.02
-
- Project Name
- Urea Handling System for Saudi's Rabigh VI SCR Supply Project
- Customer
- Doosan Heavy Industries & Construction
- Completion Date
- 2012.07
-
- Project Name
- DeNOx Catalyst Supply Project for Geoje-si Household Waste Disposal Facility
- Customer
- Geoje-si
- Completion Date
- 2012.05
-
- Project Name
- Pohang LNG Combined Cycle Power Plant NOx Reduction SCR Supply Project
- Customer
- Posco ICT
- Completion Date
- 2012.06
-
- Project Name
- Ulsan Thermal Power Plant Units 4 & 5 Hybrid SCR Denitrification System
- Customer
- Korea East-West Power
- Completion Date
- 2012.08
-
- Project Name
- Saudi Arabia Yanbu 2 Catalyst Supply Project
- Customer
- Doosan Heavy Industries & Construction
- Completion Date
- 2014.06
Water Quality Pollution Control Facilities
Project Name | Customer | Project Period |
---|---|---|
Yeongheung Thermal Power Units 1–4(Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System) |
KOEN |
1994.09 ~ 2004.12 |
Hanul Nuclear Units 5 & 6(Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System) |
KHNP |
1998.06 ~ 2003.05 |
Eonyang Sewage Treatment Plant Construction |
Ulsan-si |
2001.03 ~ 2004.10 |
Guri Sewage Treatment Plant 3rd Advanced Wastewater Treatment Project |
Guri-si |
2001.11 ~ 2003.02 |
Anseong-si Livestock Wastewater Public Treatment Plant Construction |
Anseong-si |
2002.04 ~ 2003.12 |
Shin-Kori Nuclear Power Units 1–4(Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System) |
KHNP |
2002.08 ~ Present |
Gwangju, Docheok, and Namhansanseong Sewage Treatment Plant Construction |
KPPS |
2004.12 ~ 2006.09 |
Wastewater Treatment Plant Construction in the Industrial Complex of Suwon-si |
Suwon-si |
2005.02 ~ 2005.12 |
Daesan Sewage Treatment Plant Construction |
PPS Jeonbuk |
2005.11 ~ 2008.12 |
Boryeong Sewage Treatment Plant Advanced Treatment Facility Installation Construction |
Environment Management Corp. |
2007.03 ~ 2009.05 |
Light Water Reactor Nuclear Power Condensate Polishing Plant Sewage Treatment Plant Installation |
KHNP |
2009.04 ~ 2013.01 |
Hwaseong-si Livestock Excreta Public Treatment Facility Installation Construction |
Hwaseong-si |
2009.10 ~ 2012.08 |
BNPP Units 1 & 2 (Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System) |
KEPCO |
2010.03 ~ Present |
Shin-Hanul NPP Units 1,2(Water Treatment/Wastewater treatment/Recyled Water System) |
KHNP |
2009.05 ~ Present |
Shin-Boryeong Units 1&2(Wastewater treatment/Recyled Water System) |
KOMIPO |
2011.01 ~ Present |
Ghana Takoradi T2(Wastewater treatment System) |
Takoradi lnt'l co. |
2011.01 ~ Present |
Tufanbeyli TPP Units 1 ~ 3(Wastewater treatment System) |
SK Construction |
2011.01 ~ 2015.12 |
Taean TPP Unit 9 & 10(Wastewater treatment System) |
KOWEPO |
2011.05 ~ 2017.12 |
CiPREL IV B EPC Project (Wastewater treatment/Recycled Water System) |
COMPAGINE IVOIRIENE |
2013.04 ~ 2016.03 |
Osan Cogeneration(Wastewater treatment/Recyled Water System) |
DS POWER |
2013.04 ~ 2016.03 |
Boryeong TPP(Recycled Water System) |
KOMIPO |
2013.10 ~ 2016.12 |
Performance Improvement of Hadong TPP Water Pollution Control System |
Korea Southern Power |
2016.06 ~ 2017.03 |
-
- Project Name
- Yeongheung Thermal Power Units 1–4(Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System)
- Customer
- KOEN
- Project Period
- 1994.09 ~ 2004.12
-
- Project Name
- Hanul Nuclear Units 5 & 6(Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System)
- Customer
- KHNP
- Project Period
- 1998.06 ~ 2003.05
-
- Project Name
- Eonyang Sewage Treatment Plant Construction
- Customer
- Ulsan-si
- Project Period
- 2001.03 ~ 2004.10
-
- Project Name
- Guri Sewage Treatment Plant 3rd Advanced Wastewater Treatment Project
- Customer
- Guri-si
- Project Period
- 2001.11 ~ 2003.02
-
- Project Name
- Anseong-si Livestock Wastewater Public Treatment Plant Construction
- Customer
- Anseong-si
- Project Period
- 2002.04 ~ 2003.12
-
- Project Name
- Shin-Kori Nuclear Power Units 1–4(Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System)
- Customer
- KHNP
- Project Period
- 2002.08 ~ Present
-
- Project Name
- Gwangju, Docheok, and Namhansanseong Sewage Treatment Plant Construction
- Customer
- KPPS
- Project Period
- 2004.12 ~ 2006.09
-
- Project Name
- Wastewater Treatment Plant Construction in the Industrial Complex of Suwon-si
- Customer
- Suwon-si
- Project Period
- 2005.02 ~ 2005.12
-
- Project Name
- Daesan Sewage Treatment Plant Construction
- Customer
- PPS Jeonbuk
- Project Period
- 2005.11 ~ 2008.12
-
- Project Name
- Boryeong Sewage Treatment Plant Advanced Treatment Facility Installation Construction
- Customer
- Environment Management Corp.
- Project Period
- 2007.03 ~ 2009.05
-
- Project Name
- Light Water Reactor Nuclear Power Condensate Polishing Plant Sewage Treatment Plant Installation
- Customer
- KHNP
- Project Period
- 2009.04 ~ 2013.01
-
- Project Name
- Hwaseong-si Livestock Excreta Public Treatment Facility Installation Construction
- Customer
- Hwaseong-si
- Project Period
- 2009.10 ~ 2012.08
-
- Project Name
- BNPP Units 1 & 2 (Water Treatment/Sewage&Wastewater Treatment/Wastewater Reclamation and Reusing System)
- Customer
- KEPCO
- Project Period
- 2010.03 ~ Present
-
- Project Name
- Shin-Hanul NPP Units 1,2(Water Treatment/Wastewater treatment/Recyled Water System)
- Customer
- KHNP
- Project Period
- 2009.05 ~ Present
-
- Project Name
- Shin-Boryeong Units 1&2(Wastewater treatment/Recyled Water System)
- Customer
- KOMIPO
- Project Period
- 2011.01 ~ Present
-
- Project Name
- Ghana Takoradi T2(Wastewater treatment System)
- Customer
- Takoradi lnt'l co.
- Project Period
- 2011.01 ~ Present
-
- Project Name
- Tufanbeyli TPP Units 1 ~ 3(Wastewater treatment System)
- Customer
- SK Construction
- Project Period
- 2011.01 ~ 2015.12
-
- Project Name
- Taean TPP Unit 9 & 10(Wastewater treatment System)
- Customer
- KOWEPO
- Project Period
- 2011.05 ~ 2017.12
-
- Project Name
- CiPREL IV B EPC Project (Wastewater treatment/Recycled Water System)
- Customer
- COMPAGINE IVOIRIENE DE PRODUCTION D'ELECTRICITE
- Project Period
- 2013.04 ~ 2016.03
-
- Project Name
- Osan Cogeneration(Wastewater treatment/Recyled Water System)
- Customer
- DS POWER
- Project Period
- 2013.04 ~ 2016.03
-
- Project Name
- Boryeong TPP(Recycled Water System)
- Customer
- KOMIPO
- Project Period
- 2013.10 ~ 2016.12
-
- Project Name
- Performance Improvement of Hadong TPP Water Pollution Control System
- Customer
- Korea Southern Power
- Project Period
- 2016.06 ~ 2017.03
Wastewater Treatment Facilities
Project Name | Customer | Project Period |
---|---|---|
Ulsan Thermal Power Plant Heavy Oil Fly Ash Incineration Installation Construction |
KEPCO |
1993.07 ~ 1996.01 |
Samcheonpo Thermal Power Plant Coal Ash Recycling Plant Engineering Service |
KEPCO |
1994.05 ~ 1997.07 |
Yeongheung Thermal Power Plant Coal Ash Landfill Engineering Service |
KEPCO |
1995.01 ~ 1999.01 |
Dangjin Thermal Power Plant Coal Ash Landfill Engineering Service |
KEPCO |
1995.07 ~ 1998.01 |
Feasibility Survey and Basic Plan Service for Sudokwon Landfill Site Land Fill Gas Resource Project |
KPPS |
1999.12 ~ 2000.06 |
Geumsan-gun Household Waste Sanitary Landfill Site Construction |
KECO |
2000.08 ~ 2002.02 |
Engineering Technology Service for Sudokwon Landfill Site Land Fill Gas Resource Project |
Hyundai MOBIS |
2001.08 ~ 2002.10 |
Milyang-si Food Waste and Sewage Co-treatment Facility Construction |
Milyang-si |
2002.01 ~ 2003.01 |
Suyeong Office Food Waste and Sewage Co-treatment Plant Renovation Work |
Busan Environmental Corporation |
2003.10 ~ 2004.04 |
Sudokwon Landfill Site Land Fill Gas Resource Project Construction |
ECO Energy |
2004.03 ~ 2006.12 |
Suncheon-si Food Resource Facility Construction |
Suncheon-si |
2004.12 ~ 2005.12 |
Mokpo-si Food Waste Resource Project Installation Project |
Mokpo-si |
2004.12 ~ 2006.01 |
Samcheonpo Thermal Power Plant Twice & Three-times Treatment Plant Expansion Construction Service |
KOEN |
2006.03 ~ 2006.10 |
Expansion Engineering Service for Hadong Thermal Power Plant Once Treatment Plant |
KOSPO |
2006.06 ~ 2009.09 |
-
- Project Name
- Ulsan Thermal Power Plant Heavy Oil Fly Ash Incineration Installation Construction
- Customer
- KEPCO
- Project Period
- 1993.07 ~ 1996.01
-
- Project Name
- Samcheonpo Thermal Power Plant Coal Ash Recycling Plant Engineering Service
- Customer
- KEPCO
- Project Period
- 1994.05 ~ 1997.07
-
- Project Name
- Yeongheung Thermal Power Plant Coal Ash Landfill Engineering Service
- Customer
- KEPCO
- Project Period
- 1995.01 ~ 1999.01
-
- Project Name
- Dangjin Thermal Power Plant Coal Ash Landfill Engineering Service
- Customer
- KEPCO
- Project Period
- 1995.07 ~ 1998.01
-
- Project Name
- Feasibility Survey and Basic Plan Service for Sudokwon Landfill Site Land Fill Gas Resource Project
- Customer
- KPPS
- Project Period
- 1999.12 ~ 2000.06
-
- Project Name
- Geumsan-gun Household Waste Sanitary Landfill Site Construction
- Customer
- KECO
- Project Period
- 2000.08 ~ 2002.02
-
- Project Name
- Engineering Technology Service for Sudokwon Landfill Site Land Fill Gas Resource Project
- Customer
- Hyundai MOBIS
- Project Period
- 2001.08 ~ 2002.10
-
- Project Name
- Milyang-si Food Waste and Sewage Co-treatment Facility Construction
- Customer
- Milyang-si
- Project Period
- 2002.01 ~ 2003.01
-
- Project Name
- Suyeong Office Food Waste and Sewage Co-treatment Plant Renovation Work
- Customer
- Busan Environmental Corporation
- Project Period
- 2003.10 ~ 2004.04
-
- Project Name
- Sudokwon Landfill Site Land Fill Gas Resource Project Construction
- Customer
- ECO Energy
- Project Period
- 2004.03 ~ 2006.12
-
- Project Name
- Suncheon-si Food Resource Facility Construction
- Customer
- Suncheon-si
- Project Period
- 2004.12 ~ 2005.12
-
- Project Name
- Mokpo-si Food Waste Resource Project Installation Project
- Customer
- Mokpo-si
- Project Period
- 2004.12 ~ 2006.01
-
- Project Name
- Samcheonpo Thermal Power Plant Twice & Three-times Treatment Plant Expansion Construction Service
- Customer
- KOEN
- Project Period
- 2006.03 ~ 2006.10
-
- Project Name
- Expansion Engineering Service for Hadong Thermal Power Plant Once Treatment Plant
- Customer
- KOSPO
- Project Period
- 2006.06 ~ 2009.09
Clean Development Mechanism(CDM)
Performance Status of Clean Development Mechanism (CDM) | Customer | UN Registration Date | Reduction Amount(tCO2/Year) |
---|---|---|---|
Sudokwon Landfill Site Land Fill Gas Resource CDM Project |
SL Corp. |
2007. 04 |
1,210,342 |
KHNP New & Renewable Energy CDM Project |
KHNP |
2009. 04 |
2,680 |
KHNP Cheongpyeong Water power Unit 4 Construction CDM Project |
KHNP |
2011.06 |
20,891 |
-
- Performance Status of Clean Development Mechanism (CDM)
- Sudokwon Landfill Site Land Fill Gas Resource CDM Project
- Customer
- SL Corp.
- UN Registration Date
- 2007. 04
- Reduction Amount(tCO2/Year)
- 1,210,342
-
- Performance Status of Clean Development Mechanism (CDM)
- KHNP New & Renewable Energy CDM Project(3MW Yeonggwang Solar Energy+0.75MW Kori Wind Power)
- Customer
- KHNP
- UN Registration Date
- 2009. 04
- Reduction Amount(tCO2/Year)
- 2,680
-
- Performance Status of Clean Development Mechanism (CDM)
- KHNP Cheongpyeong Water power Unit 4 Construction CDM Project
- Customer
- KHNP
- UN Registration Date
- 2011.06
- Reduction Amount(tCO2/Year)
- 20,891
Environmental Impact Assessment(EIA)
Project Name | Customer | Project Period |
---|---|---|
EIA for Shin-Wolseong Nuclear Power Units 1 & 2 Construction Project |
KHNP |
1995.06 ~ 2007.05 |
EIA for Hyoam & Bihak New Nuclear Power Plant (Shin-Kori Nuclear Power Plant Units 1–4) Construction Project |
KHNP |
1995.10 ~ 2007.05 |
EIA for 765kV Shinanseong–Shinnamwon Construction Project |
KEPCO |
1996.04 ~ 2000.01 |
EIA for North Korean Light Water Reactor (KEDO Nuclear Power Plant) Construction Project |
KEPCO |
1996.10 ~ 2002.09 |
EIA for Yeongju New Tobacco Manufacturing Plant Construction Project |
KT&G |
1999.10 ~ 2000.12 |
EIA for 345kV Yangyang-Donghae Transmission Line Construction Project |
KEPCO |
1999.11 ~ 2003.09 |
Post Environmental Impact Survey for Yeosu and Seosan Storage |
KNOC |
2000.03 ~ 2005.03 |
EIA for Sudokwon Landfill Site Land Fill Gas Resource Project |
ECO Energy |
2001.08 ~ 2003.12 |
EIA for Radiation of Wolsong Dry Storage Facility |
KHNP |
2003.12 ~ 2004.05 |
Post Environmental Impact Survey for 345kV Yangyang-Donghae Transmission Line |
KEPCO |
2005.01 ~ 2014.02 |
Environmental & Traffic Impact Assessment for Gunsan CCPP Construction Project |
KOWEPO |
2005.10 ~ 2007.07 |
Post Environmental Impact Survey for Pyeongtaek Ground Tank |
KNOC |
2006.01 ~ 2009.05 |
Post Environmental Impact Survey for Ulsan Additional Storage Site |
KNOC |
2006.01 ~ 2012.12 |
EIA for Samcheonpo Thermal Power Plant Twice & Three-times Treatment Plant Expansion Project |
KOEN |
2006.02 ~ 2007.08 |
Post Environmental Impact Survey for 345kV Boryeong-Cheongyang Transmission Line |
Boryeong Thermal Power Site Division |
2006.03 ~ 2009.12 |
Environmental & Traffic Impact Assessment for Dangjin Thermal Power Plant Units 9 & 10 Construction Project |
EWP |
2006.08 ~ 2009.08 |
EIA for Boryong Thermal Power Route Dredging |
KOMIPO |
2008.01 ~ 2011.02 |
EIA for Dongducheon CCPP Construction Project |
KOWEPO |
2009.10 ~ 2012.03 |
EIA for Bukpyeong Thermal Power Plant Construction |
STX Energy |
2010.03 ~ Present |
EIA for Radiation of Shin-Kori Units 3 & 4 |
KHNP |
2010.05 ~ 2015.08 |
EIA for Gangneung Anin Thermal Power Plant Construction Project |
Gangneung Eco Power Corp. |
2012.04 ~ 2015.06 |
-
- Project Name
- EIA for Shin-Wolseong Nuclear Power Units 1 & 2 Construction Project
- Customer
- KHNP
- Project Period
- 1995.06 ~ 2007.05
-
- Project Name
- EIA for Hyoam & Bihak New Nuclear Power Plant (Shin-Kori Nuclear Power Plant Units 1–4) Construction Project
- Customer
- KHNP
- Project Period
- 1995.10 ~ 2007.05
-
- Project Name
- EIA for 765kV Shinanseong–Shinnamwon Construction Project
- Customer
- KEPCO
- Project Period
- 1996.04 ~ 2000.01
-
- Project Name
- EIA for North Korean Light Water Reactor (KEDO Nuclear Power Plant) Construction Project
- Customer
- KEPCO
- Project Period
- 1996.10 ~ 2002.09
-
- Project Name
- EIA for Yeongju New Tobacco Manufacturing Plant Construction Project
- Customer
- KT&G
- Project Period
- 1999.10 ~ 2000.12
-
- Project Name
- EIA for 345kV Yangyang-Donghae Transmission Line Construction Project
- Customer
- KEPCO
- Project Period
- 1999.11 ~ 2003.09
-
- Project Name
- Post Environmental Impact Survey for Yeosu and Seosan Storage
- Customer
- KNOC
- Project Period
- 2000.03 ~ 2005.03
-
- Project Name
- EIA for Sudokwon Landfill Site Land Fill Gas Resource Project
- Customer
- ECO Energy
- Project Period
- 2001.08 ~ 2003.12
-
- Project Name
- EIA for Radiation of Wolsong Dry Storage Facility
- Customer
- KHNP
- Project Period
- 2003.12 ~ 2004.05
-
- Project Name
- Post Environmental Impact Survey for 345kV Yangyang-Donghae Transmission Line
- Customer
- KEPCO
- Project Period
- 2005.01 ~ 2014.02
-
- Project Name
- Environmental & Traffic Impact Assessment for Gunsan CCPP Construction Project
- Customer
- KOWEPO
- Project Period
- 2005.10 ~ 2007.07
-
- Project Name
- Post Environmental Impact Survey for Pyeongtaek Ground Tank
- Customer
- KNOC
- Project Period
- 2006.01 ~ 2009.05
-
- Project Name
- Post Environmental Impact Survey for Ulsan Additional Storage Site
- Customer
- KNOC
- Project Period
- 2006.01 ~ 2012.12
-
- Project Name
- EIA for Samcheonpo Thermal Power Plant Twice & Three-times Treatment Plant Expansion Project
- Customer
- KOEN
- Project Period
- 2006.02 ~ 2007.08
-
- Project Name
- Post Environmental Impact Survey for 345kV Boryeong-Cheongyang Transmission Line
- Customer
- Boryeong Thermal Power Site Division
- Project Period
- 2006.03 ~ 2009.12
-
- Project Name
- Environmental & Traffic Impact Assessment for Dangjin Thermal Power Plant Units 9 & 10 Construction Project
- Customer
- EWP
- Project Period
- 2006.08 ~ 2009.08
-
- Project Name
- EIA for Boryong Thermal Power Route Dredging
- Customer
- KOMIPO
- Project Period
- 2008.01 ~ 2011.02
-
- Project Name
- EIA for Dongducheon CCPP Construction Project
- Customer
- KOWEPO
- Project Period
- 2009.10 ~ 2012.03
-
- Project Name
- EIA for Bukpyeong Thermal Power Plant Construction
- Customer
- STX Energy
- Project Period
- 2010.03 ~ Present
-
- Project Name
- EIA for Radiation of Shin-Kori Units 3 & 4
- Customer
- KHNP
- Project Period
- 2010.05 ~ 2015.08
-
- Project Name
- EIA for Gangneung Anin Thermal Power Plant Construction Project
- Customer
- Gangneung Eco Power Corp.
- Project Period
- 2012.04 ~ 2015.06
Geographic Information System(GIS) Project
Project Name | Customer | Project Period |
---|---|---|
Selection of 345kV Shinnamyang Transmission Line Route |
KEPCO |
1992.05 ~ 1995.04 |
Selection of 765kV Shinnamwon-Shinanseong Transmission Line Route |
KEPCO |
1996.04 ~ 2000.01 |
EIA and Selection of 765kV Shinkori-Bukgyeongnam Transmission Route, Selection of 765kV Bukgyeongnam Substation Site |
KEPCO |
1999.05 ~ 2008.02 |
Feasibility Survey Service and Basic Engineering Project for Raising Myanmar 500kV Transmission Voltage (Transmission Line Route Engineering Work) |
KEPCO |
2004.08 ~ 2004.12 |
345kV Seonsan-Shinpohang Transmission Line Route Engineering |
KEPCO |
2005.01 ~ 2009.12 |
Selection of 154kV Bonghwa-Uljin Route Using T/L Satellite Image |
HwaShin Power Tec |
2005.06 ~ 2009.07 |
Development of Transmission & Distribution Facilities Power Impact Assessment System |
KEPCO |
2006.02 ~ 2007.07 |
Prior Disaster Impact Review and Nature Impact Assessment for Shin-Hanul Nuclear Power Units 1 & 2 |
KHNP |
2007.11 ~ 2008.12 |
Comprehensive Service for Establishing New Nuclear Power Plant Site Selection Policy |
KHNP |
2008.11 ~ 2009.11 |
Electric Power Impact Assessment Service for 154kV Ganghwa Second Substation |
KEPCO |
2009.09 ~ 2011.06 |
Electric Power Impact Assessment for 154kV Hallim Substation |
KEPCO |
2009.06 ~ 2011.02 |
Electric Power Impact Assessment for 154kV Sangbuk-Yangjeong Transmission Line |
KEPCO |
2009.11 ~ 2012.12 |
Overhead Transmission Line Routing for 345kV Saemangum T/L |
KEPCO |
2008.04 ~ 2012.12 |
Site Selection Service for 765kV ShinJungbu Substation |
KEPCO |
2012.01 ~ 2016.05 |
-
- Project Name
- Selection of 345kV Shinnamyang Transmission Line Route
- Customer
- KEPCO
- Project Period
- 1992.05 ~ 1995.04
-
- Project Name
- Selection of 765kV Shinnamwon-Shinanseong Transmission Line Route
- Customer
- KEPCO
- Project Period
- 1996.04 ~ 2000.01
-
- Project Name
- EIA and Selection of 765kV Shinkori-Bukgyeongnam Transmission Route, Selection of 765kV Bukgyeongnam Substation Site
- Customer
- KEPCO
- Project Period
- 1999.05 ~ 2008.02
-
- Project Name
- Feasibility Survey Service and Basic Engineering Project for Raising Myanmar 500kV Transmission Voltage (Transmission Line Route Engineering Work)
- Customer
- KEPCO
- Project Period
- 2004.08 ~ 2004.12
-
- Project Name
- 345kV Seonsan-Shinpohang Transmission Line Route Engineering
- Customer
- KEPCO
- Project Period
- 2005.01 ~ 2009.12
-
- Project Name
- Selection of 154kV Bonghwa-Uljin Route Using T/L Satellite Image
- Customer
- HwaShin Power Tec
- Project Period
- 2005.06 ~ 2009.07
-
- Project Name
- Development of Transmission & Distribution Facilities Power Impact Assessment System
- Customer
- KEPCO
- Project Period
- 2006.02 ~ 2007.07
-
- Project Name
- Prior Disaster Impact Review and Nature Impact Assessment for Shin-Hanul Nuclear Power Units 1 & 2
- Customer
- KHNP
- Project Period
- 2007.11 ~ 2008.12
-
- Project Name
- Comprehensive Service for Establishing New Nuclear Power Plant Site Selection Policy
- Customer
- KHNP
- Project Period
- 2008.11 ~ 2009.11
-
- Project Name
- Electric Power Impact Assessment Service for 154kV Ganghwa Second Substation
- Customer
- KEPCO
- Project Period
- 2009.09 ~ 2011.06
-
- Project Name
- Electric Power Impact Assessment for 154kV Hallim Substation
- Customer
- KEPCO
- Project Period
- 2009.06 ~ 2011.02
-
- Project Name
- Electric Power Impact Assessment for 154kV Sangbuk-Yangjeong Transmission Line
- Customer
- KEPCO
- Project Period
- 2009.11 ~ 2012.12
-
- Project Name
- Overhead Transmission Line Routing for 345kV Saemangum T/L
- Customer
- KEPCO
- Project Period
- 2008.04 ~ 2012.12
-
- Project Name
- Site Selection Service for 765kV ShinJungbu Substation
- Customer
- KEPCO
- Project Period
- 2012.01 ~ 2016.05