Strengthen the Competitiveness Based on the Technology
- 1996
- 12 Received the “Project of the Year Award” from the U.S. Magazine Power Engineering International (Taean Units 1 & 2)
- 12 Received “World’s Best Power Plant Award” from the U.S. Magazine Electric Power International (Boryeong Units 3 & 4)
- 07 Awarded Contract for Research & Development on Korean Next Generation Reactor (Phase II)
- 04 Awarded Engineering Service Contract for ROMM (Rehabilitation, Operation, Maintenance, and Management) of Malaya Thermal Power Plant Units 1 & 2 in the Philippines
- 01 Awarded Engineering Service Contract for FGD System in B-C Oil Fired Thermal Power Plant
- 1995
- 12 Received the “Project of the Year Award” from Power Engineering International (Hanbit Units 3 & 4)
- 10 Completed the Construction of Yongin Office Building and Relocated into It
- 09 Awarded Engineering Service Contract for the Construction of G-7 FGD Demonstration System
- 05 Awarded A/E Contract for Yeongheung Thermal Power Plant Units 1 & 2
- 03 Awarded A/E Contract for Hanbit Nuclear Power Plant Units 5 & 6
- 1994
- 12 Awarded Contract for the Construction of Desulfurization System for Yeongdong Thermal Power Plant Unit 1
- 11 Awarded Project Management Consulting Services Contract for the Incheon International Airport Construction Project
- 06 Awarded Contract for R&D on PSA (Probabilistic Safety Assessment) of Hanbit Units 5 & 6
- 03 Awarded Contract for the Comparison Assessment of Spent Fuel Interim Storage Methods
- 1993
- 05 Began the Construction of KEPCO E&C Information Center and Power Technology R&D Center
- 05 Awarded Engineering Service Contract for Construction of Donghae Thermal Power Plant
- 04 Awarded Project Management Supervision Services Contract for Korea Train eXpress (KTX) Project
- 01 Awarded Contract for Technological Support in Multipurpose Research Reactor Construction Project
- 1992
- 12 Awarded Contract for Research & Development on Korean Next Generation Reactor (Phase I)
- 11 Established and Operated LAN (Connected to 255 PCs) for OA
- 09 Awarded A/E Contract for Wolsong Nuclear Power Plant Units 3 & 4
- 02 Proclamation of K-SPEC•2000, and Corporate Philosophy
- 1991
- 11 Signed Contract for Pyeongtaek Combined Cycle Power Plant Engineering Service
- 07 Developed Integrated Monitoring System to Extend Life of Nuclear Power Plant
- 07 Awarded A/E Contract for Hanul Nuclear Power Plant Units 3 & 4
- 03 Awarded Engineering Service Contract for Seoincheon Combined Cycle Power Plant
- 1990
- 11 Awarded A/E Contract for Wolsong Nuclear Power Plant Unit 2
- 10 Established New Symbol Mark and Logo Type in Commemoration of the 15th Anniversary of Foundation
- 07 Awarded Engineering Service Contract for Dangjin Thermal Power Plant Units 1 & 2
- 07 Awarded Engineering Service Contract for Hadong Thermal Power Plant Units 1 & 2
- 1989
- 11 Awarded Engineering Service Contract for Boryeong Thermal Power Plant Units 5 & 6
- 07 Awarded Engineering Service Contract for Samcheonpo Thermal Power Plant Units 3 & 4
- 04 Awarded Engineering Service Contract for Muju Pumped Storage Power Plant Units 1 & 2
- 01 Awarded Engineering Service Contract for Taean Thermal Power Plant Units 1 & 2
- 1988
- 12 Awarded A/E Contract for Korean Standard Nuclear Power Plant (3rd Stage)
- 11 Signed Technological Agreement with Battle Memorial Inc. of the USA for the Construction of Treatment and Storage of Low and Intermediate Level Radioactive Waste
- 09 The First Presentation of the Company Choir
- 03 Established Action Agenda for KOPEC People
- 1987
- 12 Organized Labor Union of KOPEC
- 11 Introduced Technological Data from S&L of the USA (Standard Information, Computer Manuals, and Reference Power Plants Information)
- 07 Awarded Engineering Service Contract for Boryeong Thermal Power Plant Units 3 & 4
- 04 Awarded Engineering Service Contract for Hanbit Nuclear Power Plant Units 3 & 4